Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Jul 03, 2018 Kolocreek Well 19T Flowline at Imiringi Jul 04, 2018 Land Operational 1 No recoverable oil found, assessment planned for October 2018 - Download Download
Jul 05, 2018 Imo River Well 59 Flowline at Igiriukwu Jul 06, 2018 Land Sabotage 2 No recoverable oil found, assessment planned for October 2018 - Download Download
Jul 06, 2018 12 '' Imo River-Ogale Pipeline at Igiriukwu-Isi Etitioha Jul 10, 2018 Land Sabotage 3 Recovery completed on 13 Jul 2018, assessment planned for October 2018 - Download Download
Jul 12, 2018 16" Nun River - Kolo Creek Pipeline at Oporoma. Jul 14, 2018 Land Operational 180 Spill was contained on 13 Jul 2018, recovery planned for September 2018 - Download Download
Jul 14, 2018 20'' Rumuekpe - Nkpoku Pipeline at Ibaa Jul 18, 2018 Land Sabotage 603 Spill was contained on 13 Jul 2018, recovery completed on 28 Sep 2018, assessment planned for October 2018 - Download Download
Jul 16, 2018 24'' Bomu-Bonny Pipeline at Mogho Jul 19, 2018 Land Sabotage 12 Spill was contained on 18 Jul 2018, recovery completed on 08 Aug 2018, assessment planned for October 2018 - Download Download
Jul 16, 2018 12" Imo River-Ogale TL ROW at Umuololo-Etitiuzo Jul 18, 2018 Land Sabotage 38 Recovery planned for September 2018 - Download Download
Jul 18, 2018 20'' Rumuekpe-Nkpoku Pipeline at Mbodo-Aluu Jul 19, 2018 Land Sabotage 0.9 No recoverable oil found, assessment planned for December 2018 - Download Download
Jul 20, 2018 Agbaya well-1 Wellhead at Ogbotobo-Agbayama Jul 31, 2018 Swamp Sabotage 0.2 No recoverable oil found, assessment planned for November 2018 - Download Download
Jul 21, 2018 20'' Kolocreek-Rumuekpe Pipeline at Rumuekpe Jul 25, 2018 Land Sabotage 469 Spill was contained on 24 Jul 2018, recovery planned for September 2018 - Download Download
Jul 25, 2018 20'' Rumuekpe - Nkpoku Pipeline at Ibaa Jul 26, 2018 Land Sabotage 201 Recovery planned for September 2018 - Download Download
Jul 28, 2018 12'' Imo River - Ogale Pipeline at Ogale Aug 02, 2018 Land Sabotage 25 Spill was contained on 29 Jul 2018, recovery completed on 05 Aug 2018, assessment planned for October 2018 Site re-impated by New Event Incident #2149613 (Fire outbreak on the 12" ImoR - Ogale TL RoW at Ogale) Download Download
Jul 28, 2018 24" Nkpoku-Bomu Pipeline at Sime Aug 01, 2018 Land Sabotage 7 Spill was contained on 31 Jul 2018, recovery completed on 10 Aug 2018, assessment planned for December 2018 - Download Download
Jul 30, 2018 16'' NunRiver-Kolocreek Pipeline at Otuegwe Jul 21, 2018 Land Sabotage 167 Recovery planned to be completed on October 2018 ‘’The Joint Investigation Visit (JIV) commenced on 21st July 2018; the same day the leak was reported. However JIV could not be concluded on that day due to access and logistics challenges occasioned by the terrain. The Joint Investigating team returned to site on 2nd August 2018 on which date the JIV was concluded’’ Download Download