Spills data for February 2021

All download files are in PDF format and open in a new window.

February 2021
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Recovered Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Feb 05, 2021 Bonny Terminal Single Point Mooring 3 at Bonny Feb 06, 2021 Water Operational 7 n/a No recoverable oil found, assessment completed on 06 Feb 2021, clean-up and remediation not required, site certified on 15 Jul 2021, documentation planned to be completed in Dec 2022 ”The delay in completing the JIV was occasioned by the need to mobilize the logistics necessary to safely remove the ruptured hose from deep water to facilitate inspection by the JIT” Download Download
Feb 06, 2021 Belema Wells 8 Well Head at Belema Feb 09, 2021 Swamp Sabotage 0.1 n/a No recoverable oil found, assessment completed on 09 Feb 2021, clean-up and remediation not required, site certified on 05 Feb 2022, documentation completed on 30 Jun 2022 - Download Download
Feb 06, 2021 Belema Wells 6 Well Head at Belema Feb 09, 2021 Swamp Sabotage 0.1 n/a No recoverable oil found, assessment completed on 09 Feb 2021, clean-up and remediation not required, site certified on 05 Feb 2022, documentation completed on 31 May 2022 - Download Download
Feb 10, 2021 8'' Ubie Delivery Line at Idu-Ekpeye Feb 11, 2021 Land Operational 0.7 n/a No recoverable oil found, assessment completed on 13 Jul 2021, clean-up and remediation not required, site certified on 18 Mar 2022, documentation completed on 29 Jun 2022 - Download Download
Feb 11, 2021 18” Assa - Rumuekpe Pipeline at Awara Feb 14, 2021 Land Sabotage 12 n/a No recoverable oil found, assessment completed on 14 Oct 2021, clean-up and remediation not required, site certification planned to be completed in Sep 2023 - Download Download
Feb 13, 2021 12" Imo River2 - Ogale Pipeline at Etitiuzor, Owaza Feb 15, 2021 Land Sabotage 13 8 Recovery completed on 18 Feb 2021, assessment completed on 24 Apr 2021, clean-up and remediation completed on 10 Dec 2021, site certified on 21 Dec 2022, documentation completed on 31 Mar 2023 - Download Download
Feb 13, 2021 20" KoloCreek-Rumukpe Pipeline at Odau KM9 Feb 15, 2021 Land Sabotage 463 408 Recovery completed on 07 Mar 2021, assessment completed on 19 Jul 2022, clean-up and remediation not required, site certification planned to be completed in Dec 2022 - Download Download
Feb 15, 2021 14'' Okordia - Rumuekpe Pipeline at Akinima Feb 18, 2021 Land Sabotage 710 652 Recovery completed on 13 Apr 2021, assessment completed on 17 Mar 2023, clean-up and remediation not required, site certification planned to be completed in Sep 2023 Spill volume adjusted subsequent to JIV based on additional information gained during recovery operations Download Download
Feb 16, 2021 14" Okordia-Rumuekpe Pipeline at Ikarama Feb 19, 2021 Land Sabotage 305 250 Recovery completed on 13 Apr 2021, assessment completed on 05 Jun 2023, clean-up and remediation not required, site certification planned to be completed in Aug 2023 The incident, as ascertained by Nigeria Police Anti-Bomb Squad,  was as a result of an explosive impact on the pipeline caused by unknown person(s) Download Download
Feb 18, 2021 16" Egbema - Assa Pipeline at Obiakpu Feb 20, 2021 Land Sabotage 16 10 Recovery completed on 28 Feb 2021, assessment completed on 02 Sep 2021, clean-up and remediation planned to be completed in Mar 2023 - Download Download
Feb 18, 2021 6'' Imo River Well 26S Flowline at Owaza Feb 20, 2021 Land Sabotage 3 1.8 Recovery completed on 07 Mar 2021, assessment completed on 29 Jun 2021, clean-up and remediation not required, site certification planned to be completed in Sep 2023 - Download Download