September 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
04-Sep-12 10'' Kokori Delivery line at Awhire 05-Oct-12 Land Operational 8 Containment in place. Recovery commenced on 16th October 2012 and was completed on 30th October 2012. Initial Cleanup of residual impacted area was completed on 12th February 2013. Remediation was completed on 5th April 2013. JIV was delayed due to flooding of the spill site. Recovery was delayed due to community issues. Site Certification completed on 16th May 2013. Download Photo Download JIV Report
07-Sep-12 Bonny Well 2L Right Of Way Flowline at Bonny 05-Nov-12 Swamp Operational 4 No recoverable oil was found on site. JIV ended 13th November 2012, following the construction of a cofferdam to expose the leak point. JIV recommended no further cleanup action required. Closed. Download Photo Download JIV Report
08-Sep-12 Benisede Well 15T at Ojobo 12-Sep-12 Swamp Sabotage / Theft 0.0003 No recoverable oil was found on site. Estimated Spill Volume was 0.036 liters. JIV recommends no further cleanup action required. Closed. Download Photo Download JIV Report
10-Sep-12 Opukushi Well 25T at Agbediama 13-Sep-12 Swamp Operational 8.5 Containment in place. Recovery of spilled volume commenced on 25th September 2012 and was completed on 8th October 2012. Initial Cleanup of residual impacted area was completed on 12th February 2013. Overall schedule impacted by protracted community contracting. Site Certification was completed on 21st March 2013. Download Photo Download JIV Report
10-Sep-12 28" Nkpoku - Bomu Pipeline at Gio 13-Sep-12 Land Sabotage / Theft 35.8 Recovery of spilled volume was completed on 15th September 2012. JIV Started on 13th September and was completed on 15th September 2012. Site Certification was completed on 29th October 2013. Download Photo Download JIV Report
11-Sep-12 16'' Uzere - Eriemu Pipeline at Iyede 12-Sep-12 Land Sabotage / Theft 9.8 Recovery of spilled volume was completed on 12th September 2012. Initial Cleanup of residual impacted area was completed on 25th November 2012. Remediation was completed on 30th November 2012. JIV commenced on 22nd September 2012 and was completed on 26th September 2012. Following further clarifications regarding the cause of spill (as per community request), the report was finalised on 2nd November 2012. Remediation ongoing. Site certification now planned for July 2013. Download Photo Download JIV Report
11-Sep-12 8" Ubie Pipeline at Ukpeliede Manifold 22-Sep-12 Land Sabotage / Theft 170.6 Recovery of spilled volume commenced on 2nd October 2012, but was suspended on 8th of October 2012 due to site flood. Recovery of spilled volume recommenced on 28th November 2012 and was completed 24th December 2012. JIV commenced on 22nd September 2012 and was completed on 26th September 2012. Following further clarifications regarding the cause of spill (as per community request), the report was finalised on 2nd November 2012. Site certification completed on 2nd September 2013. Download Photo Download JIV Report
12-Sep-12 Imo River 3 Well 33 L Wellhead at Owaza 14-Sep-12 Land Sabotage / Theft 0.5 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 23rd October 2012. Remediation was completed on 3rd November 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
14-Sep-12 Uzere Well 12 Flowline and Gasline at Ezede-Uzere 25-Sep-12 Land Sabotage / Theft 12.1 Containment in place. JIV was delayed by a long running community dispute. Security issues persist, stalling further work. Download Photo Download JIV Report
15-Sep-12 16" Egbema - Assa Trunkline at Umudike 29-Sep-12 Land Operational 155 Recovery of spilled volume commenced on 29th September 2012 and was completed on 17th October 2012. An initial attempt to conduct a JIV on 19th September 2012 was stalled due to community disturbances. Site certification was completed on 30th September 2013. Download Photo Download JIV Report
15-Sep-12 Cawthorne Channel 1 Well 49L at Cawthorne Channel 19-Sep-12 Swamp Sabotage / Theft 16.89 Recovery of spilled volume commenced on 21st September 2012 and was completed on 5th October 2012. Initial Cleanup of residual impacted area was completed on 6th December 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
16-Sep-12 Santa Barbara Well 11 T at Santa Barbara 18-Sep-12 Swamp Operational 1 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 6th December2012. Remediation is ongoing, Site Certification completed on 13th March 2013. Download Photo Download JIV Report
16-Sep-12 Agbada 2 Well 41/42/43 Wellheads at Umuohia 17-Sep-12 Land Sabotage / Theft 15.05 Recovery of spilled volume commenced on 17th September 2012 and was completed on 3rd October 2012. Initial Cleanup of residual impacted area was completed on 6th December2012. Site Certification completed on 2nd September 2013. Download Photo Download JIV Report
16-Sep-12 18" Assa - Rumuekpe Trunkline at Awara 19-Sep-12 Land Operational 48 Recovery of spilled volume commenced on 17th September 2012 and was completed on 26th September 2012. Initial Cleanup of residual impacted area was completed on 20th August 2012. Site certification completed on 2nd September 2013. Download Photo Download JIV Report
17-Sep-12 20" Buguma - Alakiri TL at Daily Bread (Bukuma) 23-Sep-12 Swamp Sabotage / Theft 2.4 No recoverable oil was found on site. Initial cleanup of residual impacted area was completed on 14th November 2012. Site Certification was completed on 18th July 2013. Download Photo Download JIV Report
17-Sep-12 16'' Uzere - Eriemu Trunkline at Iyede 18-Sep-12 Land Sabotage / Theft 24 Recovery of spilled volume was completed on 18th September 2012. Initial Cleanup of residual impacted area was completed on 19th November 2012. Remediation was completed on 3rd December 2012. Site Certification completed on 5th February 2013. Download Photo Download JIV Report
20-Sep-12 10" Diebu - Nun-River Delivery line at Ekowe 25-Oct-12 Swamp Sabotage / Theft 26 Recovery of spilled volume commenced on 20th October 2012 and was completed on 14th November 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. JIV was delayed due to construction of a cofferdam. Site certification was completed on 20th August 2013. Download Photo Download JIV Report
22-Sep-12 28" Nkpoku - Bomu Pipeline at Gio. 24-Sep-12 Land Sabotage / Theft 67 Recovery of spilled volume completed on 27th September 2012. Site Certification was completed on 29th October 2013. Download Photo Download JIV Report
24-Sep-12 20'' Opukushi - Brass Creek Trunkline at Opukushi 28-Sep-12 Swamp Sabotage / Theft 15 Containment in place. Recovery of spilled volume was completed on 29th September 2012. Site Certification was completed on 24th October 2013. Download Photo Download JIV Report
24-Sep-12 4" Obelle - Ibaa Delivery Line at Ibaa 27-Sep-12 Land Sabotage / Theft 95.7 Recovery of spilled volume was completed on 30th September 2012. Initial Cleanup of residual impacted area was completed on 23rd October 2012. Site Certification was completed on 24th December 2012. Download Photo Download JIV Report
27-Sep-12 Nembe 1 Well 19S at Nembe 28-Sep-12 Swamp Sabotage / Theft 4.9 Recovery of spilled volume was completed on 27th September 2012. Initial Cleanup of residual impacted area was completed on 29th October 2012. Formal close-out of JIV was delayed due to disagreement over the cause of spill by the communities. Site certification was completed on 13th March 2013. Download Photo Download JIV Report
27-Sep-12 24" Bomu - Bonny Trunkline at Freetown 04-Oct-12 Swamp Operational 7.7 No recoverable oil was found on site. Cleanup of residual impacted area was completed on 9th July 2013. Schedule considers protracted community contracting. Site Certification was completed on 20th August 2013. Download Photo Download JIV Report
30-Sep-12 12" Afiesere - Eriemu Delivery Line at Afiesere 01-Oct-12 Land Operational 29 Recovery of spilled volume commenced on 1st October 2012 and was completed on 9th November 2012. Initial Cleanup of residual impacted area was completed on 21st January 2013. Remediation was completed on 4th February 2013. JIV commenced on 1st October 2012 and was completed on 2nd October 2012. Further investigation has been initiated to verify the cause of spill. Site Certification completed on 2nd April 2013. Download Photo Download JIV Report