October 2018
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Oct 01, 2018 12" Imo River - Ogale Pipeline at Okpa-umuakpa Oct 03, 2018 Land Sabotage 57 Recovery completed on 19 Oct 2018, assessment planned to be completed on June 2019 - Download Download
Oct 05, 2018 28'' Nkpoku - Bomu Pipeline at Gio Oct 11, 2018 Land Sabotage 0.3 No recoverable oil found, assessment completed on 25 Oct 2018, clean-up and remediation planned to be completed on November 2019 - Download Download
Oct 15, 2018 20'' Kolocreek-Rumuekpe Pipeline at Imogu-Rumuekpe Oct 19, 2018 Land Sabotage 332 Recovery completed on 27 Nov 2018, assessment completed on 16 Jan 2019, clean-up and remediation planned to be completed on July 2019 The incident occurred 15th October 2018 while JIV and repair work commenced on 19th October 2018. Cause of leak was from third party tampering with the concrete grout on an existing illegal crude oil theft point. Download Download
Oct 17, 2018 20" Kolo Creek - Rumuekpe Pipeline at Okporowo Nov 14, 2018 Land Sabotage 2 No recoverable oil found, assessment completed on 02 Feb 2019, clean-up and remediation completed on 02 Feb 2019, site certification planned to be completed on July 2019 - Download Download
Oct 24, 2018 18” Soku – Buguma Pipeline at Soku Oct 29, 2018 Swamp Sabotage 0.4 No recoverable oil found, assessment completed on 11 Feb 2019, clean-up and remediation not required, site certified on 19 Mar 2019 The incident occurred on 24th October 2018, the JIV commenced on 29th October 2018 but could not progress because the spill point was found by the JIT to be under water as the site was flooded. A cofferdam was constructed to enable access to the spill point and JIV was then restarted on 11th February 2019 and completed on 11th February 2019. Download Download
Oct 24, 2018 Imo River1 Well 37 Flowline at Igiriukwu_Owaza Oct 26, 2018 Land Sabotage 0.2 No recoverable oil found, assessment completed on 02 Nov 2018, clean-up and remediation completed on 24 Feb 2019, site certified on 10 May 2019 - Download Download
Oct 27, 2018 24'' Bomu-Bonny Pipeline at Patrick Waterside Oct 29, 2018 Swamp Sabotage 157 Spill was contained on 26 Oct 2018, recovery planned to be completed on December 2018 - Download Download
Oct 27, 2018 4'' Bonny Well 18S Flowline Riser at Oloma Oct 31, 2018 Swamp Operational 5 Recovery completed on 29 Oct 2018, assessment completed on 19 Dec 2018, clean-up and remediation completed on 19 Dec 2018, site certification planned to be completed on May 2019 - Download Download