November 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
01-Nov-12 8'' Obigbo North - Elelenwa Pipeline at Umusia 02-Nov-12 Land Sabotage / Theft 511.6 Recovery of spilled volume commenced on 2nd November 2012 and was completed on 5th November 2012. Cleanup of residual impacted area was completed on 30th July 2013. JIV commenced on 2nd November 2012 and was completed on 3rd November 2012. Site certification completed on 26th August 2013. Download Photo Download JIV Report
02-Nov-12 12" Imo River 1 and 2 - Ogale Pipeline at komkom 08-Nov-12 Land Sabotage / Theft 4689 Recovery of spilled volume commenced on 3rd November 2012 and was completed on 22nd December 2012. Cleanup of residual impacted area was completed on 31st May 2013. 4229 barrels of crude was recovered. Site was reimpacted by illegal refining activities. Site certification was completed on 31st July 2014. Download Photo Download JIV Report
03-Nov-12 24" Ogale-Bonny Pipeline at Kpite 06-Nov-12 Land Sabotage / Theft 3 No recoverable oil was found on site. Initial cleanup of residual impacted area completed on 26th April 2013. The JIV ended on 7th November 2012. Site certification completed on 30th June 2013.
Download Photo Download JIV Report
08-Nov-12 24" Nkpoku-Bonny Pipeline at Biara 09-Nov-12 Land Sabotage / Theft 3 No recoverable oil was found on site. Cleanup of residual impacted area was completed on 21st October 2013. Site Certification completed on 30th October 2013. Download Photo Download JIV Report
10-Nov-12 28" Nkpoku - Bomu Pipeline at Gio 11-Nov-12 Land Sabotage / Theft 111 Recovery of spilled volume commenced on 10th November 2012 and was completed on 15th November 2012. Cleanup of residual impacted area was completed on 11th November 2013. JIV ended 12th November 2012. Delay in accessing site caused by community activities. Site Certification was completed on 10th December 2013. Download Photo Download JIV Report
11-Nov-12 24" Bomu-Bonny Pipeline at Mogho 15-Nov-12 Land Sabotage / Theft 14 Recovery of spilled volume completed on 17th November 2012. Site Certification was completed on 29th September 2013. Download Photo Download JIV Report
12-Nov-12 8" Obigbo North - Komkom Pipeline at Umuokolobo 14-Nov-12 Land Sabotage / Theft 20 Recovery of spilled volume was completed on 15th November 2012. Cleanup of residual impacted area completed on 25th March 2013. Site Certification was completed on 13th May 2013. Download Photo Download JIV Report
13-Nov-12 Obigbo Well 28 L/S Flowline at Umuebulu 15-Nov-12 Land Sabotage / Theft 0.1 No recoverable oil was found on site. JIV recommends no further action required. Closed. Site Certification was completed on 20th August 2013. Download Photo Download JIV Report
14-Nov-12 Imo River 1 Well 18 Flow Line at Owaza 16-Nov-12 Land Sabotage / Theft 366 Recovery of spilled volume commenced on 20th November 2012 and was completed 20th December 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. Site Certification was completed on 29th April 2013. Download Photo Download JIV Report
15-Nov-12 Imo River 1 Well 25S Flowline at Owaza 16-Nov-12 Land Sabotage / Theft 7 Recovery of spilled volume commenced on 20th November 2012 and was completed on 27th November 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. Site Certificationwas completed on 29th April 2013. Download Photo Download JIV Report
17-Nov-12 12'' Imo River - Oghale Pipeline at Uzuaku 19-Nov-12 Land Sabotage / Theft 33 Recovery of spilled volume commenced on 20th November 2012 and was completed on 27th November 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. Site Certification completed on 30th July 2013. Download Photo Download JIV Report
19-Nov-12 Oroni Well-1 Flowline at Okpole-Enwhen 22-Nov-12 Land Operational 0.1 No recoverable oil was found on site. Incident due to flood induced secondary spill from a yet-to-be-repaired stolen Flowline section. Initial cleanup of residual impacted area planned for completion in March 2013. Download Photo Download JIV Report
20-Nov-12 Imo River Well 64S Flowline at Imo River 22-Nov-12 Land Sabotage/Theft 603 spilled volume commenced on 22nd November 2012 and was completed 28th December 2012. JIV was completed on 23rd November 2012. Whilst awaiting certification, site re-impacted by a new sabotage incident (4" Imo River Well 64L Flow line at Igiriukwu) on 1st April 2013. Further cleanup action reported under the new incident entry. Site Certification was completed on 31st July 2014. Download Photo Download JIV Report
23-Nov-12 20'' Otumara - Escravos Pipeline at Escravos 24-Nov-12 Swamp Sabotage / Theft 611 Containment in place. Recovery of spilled volume commenced on 5th December 2012. Initial cleanup of residual impacted area commenced on 18th February 2013 and was completed on 10th March 2013. Site Certification completed on 23rd April 2013. Download Photo Download JIV Report
27-Nov-12 Cawthorne Channel 2 Well 28T Flowline at Owame-ama / Okpoama 28-Nov-12 Swamp Operational 25 Recovery of spilled volume commenced on 4th December 2012 and was completed on 27th December 2012. Initial cleanup of residual impacted area was completed on 20th May 2013. Delay due to contracting. Site Certification was completed on 11th July 2013. Download Photo Download JIV Report
29-Nov-12 24" Nkpoku - Bomu Pipeline at Egbalor 30-Nov-12 Land Sabotage / Theft 5 No recoverable oil was found on site. Initial cleanup of residual impacted area completed on 1st June 2013. JIV was completed on 1st December 2012. Site certification was completed on 30th June 2013. Download Photo Download JIV Report
30-Nov-12 Nembe 1 Well 19S Wellhead at Ogbolomabiri 03-Dec-12 Swamp Operational 0.8 No recoverable oil was found on site. JIV recommends no further cleanup action required. Closed. Download Photo Download JIV Report