Spills data for May 2020

All download files are in PDF format and open in a new window.

May 2020
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
May 01, 2020 28'' Nkpoku - Bomu Pipeline at B-Dere May 02, 2020 Land Sabotage 16 Spill was contained on 02 May 2020, no recoverable oil found, assessment planned to be completed on August 2020 - Download Download
May 02, 2020 28'' Nkpoku - Bomu Pipeline at Elelenwo May 02, 2020 Land Sabotage 60 Recovery completed on 03 May 2020, assessment planned to be completed on August 2020 - Download Download
May 03, 2020 14” Okordia – Rumuekpe Pipelin at Edeoha May 05, 2020 Land Sabotage 8 Spill was contained on 04 May 2020, no recoverable oil found, assessment planned to be completed on August 2020 - Download Download
May 03, 2020 16” Egbema – Assa Pipeline at Etekwuru May 07, 2020 Land Sabotage 63 Spill was contained on 04 May 2020, recovery planned to be completed on June 2020 - Download Download
May 04, 2020 8” Nkali – Imo River Pipeline at Odagwa May 04, 2020 Land Sabotage 1 No recoverable oil found, assessment planned to be completed on August 2020 - Download Download
May 05, 2020 4'' Imo River Well 55S Flowline at Igiriukwu May 05, 2020 Land Sabotage 1 No recoverable oil found, assessment planned to be completed on October 2020 - Download Download
May 08, 2020 3'' AdibawaWell 6T Flowline Flange at Edagberi-Betterland May 12, 2020 Land Operational 0.7 No recoverable oil found, assessment planned to be completed on September 2020 - Download Download
May 09, 2020 4'' Bonny Well 10S Flowline Riser at Oloma May 25, 2020 Swamp Operational 0.1 No recoverable oil found, assessment planned to be completed on October 2020 - Download Download
May 27, 2020 20" Kolocreek - Rumuekpe Pipeline at Aminigboko May 30, 2020 Land Sabotage 3 Recovery completed on 02 Jun 2020, assessment planned to be completed on October 2020 - Download Download
May 28, 2020 4'' Kanbo Well 5L Flowline at Tunu Jun 04, 2020 Swamp Sabotage 0.03 No recoverable oil found, assessment completed on 04 Jun 2020, clean-up and remediation not required, site certification planned to be completed on November 2020 - Download Download
May 30, 2020 12'' ImoRiver 2 - Ogale Pipeline at KomKom May 31, 2020 Land Sabotage 2 Recovery completed on 31 May 2020, assessment planned to be completed on September 2020 - Download Download