Spills data for March 2021

All download files are in PDF format and open in a new window.

March 2021
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Recovered Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Mar 02, 2021 12" ImoRiver2 - Imo River1 Pipeline at Odagwa Mar 04, 2021 Land Sabotage 12 n/a Recovery completed on 06 Mar 2021, assessment planned to be completed in Jun 2021 - Download Download
Mar 06, 2021 6'' Seibuo Well 3 & 4 Bulkline at Ogbeinbiri Mar 15, 2021 Land Sabotage 18 n/a Recovery planned to be completed in Apr 2021 - n/a n/a
Mar 11, 2021 14" Okordia - RumuekpePipeline at Edeoha Mar 13, 2021 Land Sabotage 0.9 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Mar 11, 2021 8" Isimiri - Imogate Pipeline at Umuelechi Mar 13, 2021 Swamp Sabotage 211 n/a Recovery planned to be completed in Mar 2021 - Download Download
Mar 17, 2021 4'' Bulkline Biseni Well 4 Flowline at Biseni Mar 18, 2021 Land Sabotage 0.9 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Mar 18, 2021 28" Bomu - Bonny Pipeline at Owokiri Mar 18, 2021 Swamp Sabotage 0.4 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Mar 25, 2021 4'' Nkali Well 13L/S Flowline at Odagwa2 Mar 26, 2021 Land Sabotage 0.8 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - n/a n/a
Mar 25, 2021 4'' Nkali Well 10S Flowline at Odagwa2 Mar 26, 2021 Land Sabotage 2 n/a Recovery planned to be completed in Apr 2021 - n/a n/a