July 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
3-Jul-12 Opukushi Well 24T Flowline ROW 10-Jul-12 Swamp Operational 35.7 Recovery of spilled volume commenced on 4th July 2012 and was completed 23rd July 2012. Initial cleanup of residual impacted area was completed on 14th October 2012. Site certification completed on 21st November 2012. Download Photo Download JIV Report
4-Jul-12 16'' Uzere - Eriemu Pipeline at Iyede 5-Jul-12 Land Sabotage / Theft 6.3 Recovery of spilled volume commenced on 5th July 2012 and was completed on 6th July 2012. Initial cleanup of residual impacted area was completed on 11th September 2012. Site certification was completed on 17th October 2012. Download Photo Download JIV Report
7-Jul-12 28" Nkpoku - Bomu Pipeline at Gio 14-Jul-12 Land Sabotage / Theft 9.8 Recovery of spilled volume was completed on 15th July 2012. Initial cleanup of residual impacted area completed on 22nd April 2013. Site certification completed on 30th June 2013. Download Photo Download JIV Report
8-Jul-12 36" Rumuekpe - Nkpoku Pipeline at Mgbodo Aluu 9-Jul-12 Land Sabotage / Theft 379.1 Recovery of spilled volume commenced on 8th July 2012 and was completed on 20th July 2012. Initial Cleanup of residual impacted area was completed on 27th September 2012. Site Certification was completed on 13th May 2013. Download Photo Download JIV Report
11-Jul-12 12” Kokori - Eriemu Pipeline at Okpara (Agbarha-Otor Community) 12-Jul-12 Land Sabotage / Theft 323 Recovery of spilled volume commenced on 11th July 2012 and was completed on 12th July 2012. Initial Cleanup and remediation of residual impacted area was completed on 30th March 2013. The spill incident was followed by fire which disrupted the JIV and eventually burnt itself out. JIV spanned 2 days, 12th through 13th July 2012 as a result of the fire. Site Certification was completed on 23rd May 2013. Download Photo Download JIV Report
13-Jul-12 Cawthorne Channel 2 Well 51 T at Mbiama 18-Jul-12 Swamp Sabotage / Theft 1.8 Recovery of spilled volume commenced on 18th July 2012 and was completed on 24th July 2012. Initial Cleanup of residual impacted area and remediation completed on 15th September 2012. Site certification completed on 13th November 2012. Download Photo Download JIV Report
16-Jul-12 8” Umuechem – Nkpoku Delivery Line at Umuwenye 16-Jul-12 Land Sabotage / Theft 3 No recoverable oil was found on site. Initial Cleanup of residual impacted area completed on 17th September 2012. Remediation was completed on 8th October 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
16-Jul-12 18" Assa - Rumuekpe Trunkline at Egbeda 18-Jul-12 Land Sabotage / Theft 4.2 Recovery of spilled volume was completed on 18th July 2012. Initial Cleanup of residual impacted area was completed on 2nd October 2012. Site Certification was completed on 26th May 2013. Download Photo Download JIV Report
16-Jul-12 12" Imo River II - Ogale Pipeline at Owaza. 18-Jul-12 Land Sabotage / Theft 1 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 6th September 2012. Remediation was completed on 27th September 2012. JIV took two days 18th - 19th July 2012 in order to cover two sites in the same area. Site certification completed on 13th November 2012. Download Photo Download JIV Report
18-Jul-12 12" Imo River II - Ogale Pipeline at Owaza. 18-Jul-12 Land Sabotage / Theft 1 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 6th September 2012. Remediation was completed on 27th September 2012. Site certification completed on 13th November 2012. Download Photo Download JIV Report
20-Jul-12 8" Umuechem - Nkpoku delivery line at Umuechem 21-Jul-12 Land Sabotage / Theft 10.9 Recovery of spilled volume was completed on 21st July 2012. Initial Cleanup of residual impacted area was completed on 17th September 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
23-Jul-12 36" Nkpoku - Bomu Trunkline at Eneka. 26-Jul-12 Land Sabotage / Theft 88 Recovery of spilled volume commenced on 26th July 2012 and completed 27th July 2012. Initial Cleanup of residual impacted area was completed on 31st October 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
24-Jul-12 8" Umuechem - Nkpoku Pipeline at Omusele 26-Jul-12 Land Sabotage / Theft 5.6 Recovery of spilled volume was completed on 27th July 2012. Initial Cleanup of residual impacted area was completed on 17th September 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
27-Jul-12 36" Nkpoku-Bomu Trunkline at Atali 29-Jul-12 Land Sabotage / Theft 60 Recovery of spilled volume commenced on 29th July 2012 and completed 31st July 2012. Initial Cleanup of residual impacted area was completed on 31st October 2012. Site Certification completed on 24th December 2012. Download Photo Download JIV Report
27-Jul-12 10” Utorogu-UPS Pipeline at Otu- Jeremi 28-Jul-12 Land Sabotage / Theft 53.4 Recovery of spilled volume was completed on 28th July 2012. Cleanup of residual impacted area was completed on 13th April 2013. Site Certification was completed on 23rd May 2013. Download Photo Download JIV Report
30-Jul-12 12" Afiesere - Eriemu Delivery Line at Emeragha 31-Jul-12 Land Sabotage / Theft 223.3 Recovery of spilled volume commenced on 4th August 2012 and was completed on 30th August 2012. Initial Cleanup of residual impacted area was completed on 28th December 2012. Schedule impacted by heavy rainfall and flooding during the rainy season. Site certification was completed on 23rd May 2013. Download Photo Download JIV Report