Spills data for January 2021

All download files are in PDF format and open in a new window.

January 2021
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Recovered Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Jan 02, 2021 8" Nkali - Imo River2 Pipeline at Odagwa Jan 04, 2021 Land Sabotage 3 n/a Recovery completed on 04 Jan 2021, assessment planned to be completed in Jun 2021 - Download Download
Jan 06, 2021 16" Egbema to Assa Pipeline at Obile Jan 08, 2021 Land Sabotage 4 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Jan 08, 2021 4" Imo River Well 22S Flowline at Owaza Jan 11, 2021 Land Sabotage 0.4 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Jan 08, 2021 18" Assa to Rumuekpe Pipeline at Ububo Ochia Jan 09, 2021 Land Sabotage 444 n/a Recovery planned to be completed in Jun 2021 - Download Download
Jan 09, 2021 18" Assa to Rumuekpe Pipeline at Elele Alimini Jan 10, 2021 Land Sabotage 149 n/a Recovery planned to be completed in Jun 2021 - Download Download
Jan 14, 2021 12" Oguta Egbema Pipeline at Opuoma Jan 16, 2021 Land Sabotage 18 n/a Recovery completed on 16 Jan 2021, assessment planned to be completed in Jun 2021 - Download Download
Jan 18, 2021 6'' kanbo Well 7S Flowline at Agbidiama Jan 29, 2021 Swamp Sabotage 13 n/a Recovery planned to be completed in Feb 2021 The delay in commencing the JIV was due to the swampy terrain surrounding the incident site which required the hiring of a swamp buggy to enable the JIT mobilize to the site. Download Download
Jan 18, 2021 28" Bomu -Bonny Pipeline at Freetown Jan 18, 2021 Swamp Sabotage 2 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Jan 23, 2021 14'' Okordia - Rumuekpe pipeline at Ukpeliede Jan 25, 2021 Land Sabotage 5 n/a Recovery completed on 30 Jan 2021, assessment planned to be completed in Jun 2021 - Download Download
Jan 24, 2021 6'' Kanbo Well 6T Flowline at Tunu Jan 27, 2021 Swamp Operational 27 n/a Recovery completed on 02 Feb 2021, assessment planned to be completed in Jun 2021 - Download Download
Jan 27, 2021 4'' Imo River 2 - 1 Testline and 2'' Imo River 1-2 Gaslift line at Igiriukwu Jan 30, 2021 Land Sabotage 1 n/a No recoverable oil found, assessment planned to be completed in Jun 2021 - Download Download
Jan 30, 2021 8'' Nkali-Imo River2 Pipeline at Odagwa Feb 01, 2021 Land Sabotage 2 n/a Recovery completed on 01 Feb 2021, assessment planned to be completed in Jun 2021 - Download Download