February 2021
Spills data for February 2021
All download files are in PDF format and open in a new window.
Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Recovered Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report |
---|---|---|---|---|---|---|---|---|---|---|
Feb 05, 2021 | Bonny Terminal Single Point Mooring 3 at Bonny | Feb 06, 2021 | Water | Operational | 7 | n/a | No recoverable oil found, assessment planned to be completed in Jun 2021 | ”The delay in completing the JIV was occasioned by the need to mobilize the logistics necessary to safely remove the ruptured hose from deep water to facilitate inspection by the JIT” | Download | Download |
Feb 10, 2021 | 8'' Ubie Delivery Line at Idu-Ekpeye | Feb 11, 2021 | Land | Operational | 0.7 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |
Feb 11, 2021 | 18” Assa - Rumuekpe Pipeline at Awara | Feb 14, 2021 | Land | Sabotage | 12 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |
Feb 13, 2021 | 12" Imo River2 - Ogale Pipeline at Etitiuzor, Owaza | Feb 15, 2021 | Land | Sabotage | 13 | n/a | Recovery completed on 15 Feb 2021, assessment planned to be completed in Jun 2021 | - | Download | Download |
Feb 13, 2021 | 20" KoloCreek-Rumukpe Pipeline at Odau KM9 | Feb 15, 2021 | Land | Sabotage | 463 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |
Feb 15, 2021 | 14'' Okordia - Rumuekpe Pipeline at Akinima | Feb 18, 2021 | Land | Sabotage | 324 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |
Feb 18, 2021 | 16" Egbema - Assa Pipeline at Obiakpu | Feb 20, 2021 | Land | Sabotage | 16 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |
Feb 18, 2021 | 6'' Imo River Well 26S Flowline at Owaza | Feb 20, 2021 | Land | Sabotage | 3 | n/a | Recovery planned to be completed in Mar 2021 | - | Download | Download |