December 2017
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Dec 16, 2017 20'' Rumuekpe-Nkpoku Pipeline at Ibaa Dec 22, 2017 Land Sabotage 59 Spill was contained on 17 Dec 2017, no recoverable oil found, assessment completed on 07 Sep 2018, clean-up and remediation planned for December 2018 - Download Download
Dec 18, 2017 28'' Bomu-Bonny Pipline at Patrick Waterside Dec 19, 2017 Land Sabotage 10 Spill was contained on 19 Dec 2017, recovery completed on 16 Jan 2018, assessment planned for July 2018 - Download Download
Dec 18, 2017 28"Nkpoku-Bomu Pipeline at Eteo Dec 19, 2017 Land Sabotage 78 Recovery completed on 02 Mar 2018, assessment completed on 29 Mar 2018, clean-up and remediation completed on 28 Nov 2018, site certification planned to be completed on February 2019 - Download Download
Dec 22, 2017 Single Point Mooring one (SPM 1) at Bonny Dec 29, 2017 Water Operational 187 No recoverable oil found, assessment completed on 29 Dec 2017, clean-up and remediation not required, site certified on 29 Dec 2017 The Joint Investigation Team found that there was no residual impact therefore recommended site be closed out hence no Clean-up / Remediation was carried out. Download Download
Dec 23, 2017 Forcados Terminal Single Point Mooring (SPM)1 Jan 04, 2018 Water Operational 0.3 No recoverable oil found, assessment completed on 04 Jan 2018, clean-up and remediation not required, site certification planned for June 2018 - Download Download
Dec 23, 2017 16" Egbema–Assa Pipeline at Assa Jan 19, 2018 Land Sabotage 6 Recovery completed on 21 Jan 2018, assessment completed on 23 Feb 2018, clean-up and remediation planned for August 2018 - Download Download
Dec 23, 2017 20'' Rumuekpe-Nkpoku Pipeline at Ibaa Dec 29, 2017 Land Sabotage 113 Recovery planned for February 2018 - Download Download