December 2011
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
5-Dec-11 12" Imo River1 - Ogale Pipeline @ Komkom 7-Dec-11 Swamp Sabotage / Theft 2.2 No recoverable oil was found on site. Cleanup of residual impacted area was completed on 6th January 2012. Post Cleanup Inspection completed on 3rd February 2012. Download Photo Download JIV Report
8-Dec-11 Bonny - Oloma Well 2L Flowline at Oloma 9-Dec-11 Swamp Operational 16 No recoverable oil was found on site. Initial cleanup of residual impacted area was completed on 30th April 2012. Overall schedule considers community contracting and difficulty of the work terrain. Post Cleanup Inspection completed on 29th June 2012. Download Photo Download JIV Report
8-Dec-11 10" Diebu creek Pipeline at Oporoma 17-Dec-11 Swamp Sabotage / Theft 3.2 Containment in place. Recovery of spilled volume commenced on 31st December 2011 and was completed on 26th February 2012. Initial Cleanup of residual impacted area was completed on 7th March 2012. Post Cleanup Inspection completed on 27th March 2012. Download Photo Download JIV Report
12-Dec-11 Akaso Well 3S FL at Cawthorne Channel 15-Dec-11 Swamp Sabotage / Theft 1.5 No recoverable oil was found on site. Initial cleanup of residual impacted area was completed on 24th February 2012. Post Cleanup Inspection delayed due to security issues. Site reportedly reimpacted by a spill incident on 23rd January 2012. However, subsequent JIV found no recoverable oil on site and recommended no further cleanup action required. Closed. Download Photo Download JIV Report
13-Dec-11 Ekulama 1 Well 35 ROW at Ekulama 19-Dec-11 Swamp Operational 5.9 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 11th April 2012 Overall schedule impacted by community contracting, the difficult work terrain and fuel subsidy strike in January 2012. Post Cleanup Inspection completed on 26th May 2012. Download Photo Download JIV Report
14-Dec-11 16" Nun-River - Kolo Creek Pipeline at Aguobiri 19-Dec-11 Swamp Sabotage / Theft 41.2 Containment in place. Recovery of spilled volume commenced on 31st December 2011 and was completed on 26th February 2012. Initial Cleanup of residual impacted area was completed on 27th April 2012. Post Cleanup Inspection completed on 26th May 2012. Download Photo Download JIV Report
21-Dec-11 Nun River Well 15S Flowline ROW at Onyoma 19-Dec-11
Swamp Operational 2.50 Containment in place. Recovery of spilled volume was completed on 7th February 2012. Initial Cleanup of residual impacted area was completed on 24th February 2012. The initial JIV on 23rd December 2011 could not establish the cause of spill. A repeat JIV held on 19th January 2012 following the seasonal holidays and general strike to protest the hike in fuel prices. Post Cleanup Inspection completed on 26th March 2012. Download Photo Download JIV Report
21-Dec-11 18" Assa-Rumuekpe Pipeline at Awara 24-Dec-11 Land Sabotage / Theft 1.4 No recoverable oil was found on site. Cleanup of residual impacted area completed on 16th February 2012. Post Cleanup Inspection completed on 26th March 2012. Download Photo Download JIV Report
24-Dec-11 24" Nembe Creek Pipeline at Tora 30-Dec-11 Swamp Sabotage / Theft 245.2 Recovery of spilled volume completed on 4th January 2012. Initial Cleanup of residual impacted area was completed on 30th April 2012. JIV held from 30th - 31st December, 2011. Post Cleanup Inspection completed on 24th May 2012. Download Photo Download JIV Report