August 2011
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
2-Aug-11 12" Imo River - Ogale Pipeline at KomKom 4-Aug-11 Land Sabotage / Theft 49.5 Recovery of spilled volume completed on 7th August 2011. Cleanup of residual impacted area completed on 29th August 2011. Spill was accompanied by fire. JIV started on 4th August 2011 and was completed on 7th August 2011. Protracted delay due to site flooding during the rainy season as well as security issues which were only resolved in November 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 3rd February 2012. Download Photo Download JIV Report
2-Aug-11 14" Okordia-Rumuekpe Pipeline at Ikarama 6-Aug-11 Land Sabotage / Theft 128.6 Recovery of spilled volume commenced on 6th August 2011 and was completed on 3rd October 2011. Cleanup of residual impacted area completed on 11th November 2011. The cleanup of residual impacted areas, which was originally planned for completion in October 2011, was suspended on 18th October 2011 due to community issues. Initial volume of spill estimated during JIV of 6th August 2011 was 71.1 bbls. However, 90 bbls of oil was subsequently recovered, resulting in a restated volume of 128.6 bbls. Restated volume has been communicated to the Regulators as per statutory requirement. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 7th February 2012. Download Photo Download JIV Report
2-Aug-11 14" Okordia-Rumuekpe Pipeline at Ikarama 9-Aug-11 Land Sabotage / Theft 127.8 Recovery of spilled volume and cleanup of impacted area completed on 23rd September 2011. Post Cleanup Inspection completed on 25th November 2011. Delay due to flooding which restricted access to the site. Download Photo Download JIV Report
2-Aug-11 14" Okordia-Rumuekpe Pipeline at Ikarama 12-Aug-11 Land Sabotage / Theft 64.3 Recovery of spilled volume and Cleanup of residual impacted area completed on 2nd October 2011. Post Cleanup Inspection completed on 25th November 2011. Initial volume of spill estimated during JIV of 12th August 2011 was 34.4 bbls. However, 45 bbls of oil was subsequently recovered, resulting in a restated volume of 64.3 bbls. Restated volume has been communicated to the Regulators as per statutory requirement. Download Photo Download JIV Report
2-Aug-11 14" Okordia-Rumuekpe Pipeline at Ikarama 13-Aug-11 Land Sabotage / Theft 85.9 Recovery of spilled volume and cleanup of residual impacted area commenced on 13th August 2011 and was completed on 3rd October 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 8th February 2012. Download Photo Download JIV Report
3-Aug-11 12" Adibawa-Okordia Pipeline at Ikarama 8-Aug-11 Land Sabotage / Theft 80.7 Recovery of spilled volume commenced on 8th August 2011 and was completed on 23rd September 2011. Cleanup of residual impacted area completed on 2nd October 2011. This is the 5th sabotage incident at Ikarama since the beginning of August 2011. Post Cleanup Inspection completed on 25th November 2011. Download Photo Download JIV Report
4-Aug-11 20'' Ughelli Pumping Station -Warri Refinery Pipeline at Ekpan 5-Aug-11 Land Sabotage / Theft 34.84 Recovery of spilled volume completed on 10th August 2011. Cleanup of residual impacted area completed on 17th August 2011. Post Cleanup Inspection completed on 8th September 2011. Download Photo Download JIV Report
9-Aug-11 Saver Pit Oveflow (Obelle FS) 11-Aug-11 Land Operational 3.26 No recoverable oil was found on site. Cleanup of residual impacted area commenced on 5th October 2011 and was completed on 3rd November 2011. Delay in clean up experienced due to temporary restriction of access to site by community activities. Post Cleanup Inspection completed on 15th November 2011. Download Photo Download JIV Report
10-Aug-11 Cawthorne Channel Well 45T flowline at Mbiama 12-Aug-11 Swamp Operational 6.71 No recoverable oil was found on site. Cleanup of residual impacted area commenced on 21st September 2011 and was completed on 30th September 2011 Overall schedule considers community contracting and difficulty of the work terrain, particularly during the rains. Post Cleanup Inspection completed on 24th November 2011. Download Photo Download JIV Report
11-Aug-11 Yokri Well 114S flowline 11-Aug-11 Swamp
Operational 3 Recovery of spilled volume completed on 26th August 2011. Cleanup of residual impacted area commenced on 26th January 2012 and was completed on 30th January 2012. Delay in cleanup due to replacement of the originally nominated contractor by the community, after initiation of the contracting process as well as the difficult work terrain, particularly during the rainy season. Post Cleanup inspection completed on 17th February 2012. Download Photo Download JIV Report
12-Aug-11 Akaso Well 10L Flowline at Cawthorne Channel 16-Aug-11 Swamp Sabotage / Theft 0.4 No recoverable oil was found on site. Cleanup of residual impacted area was originally planned for completion in October 2011 but reassessment revealed no residual impact. Post Cleanup Inspection completed on 24th November 2011. Download Photo Download JIV Report
13-Aug-11 Well 29T flowline at Cawthorne Channel 16-Aug-11 Swamp Operational 0.7 No recoverable oil was found on site. Cleanup of residual impacted area commenced on 20th October 2011 and was completed on 30th October 2011. Delay in cleanup was due to site flooding as a result of heavy rains. Post Cleanup Inspection completed on 23rd November 2011. Download Photo Download JIV Report
14-Aug-11 20" Buguma-Alakiri trunkline at Abiama 19-Aug-11 Swamp Sabotage / Theft 0.84 No recoverable oil was found on site JIV report confirms no further cleanup action required. Closed. Download Photo Download JIV Report
15-Aug-11 14" Okordia - Rumuekpe Trunkline at Ikarama 19-Aug-11 Land Sabotage / Theft 84.7 Recovery of spilled volume commenced on 20th August 2011 and was completed on 25th November 2011. Cleanup of residual impacted area was completed on 19th December 2011. The site was set on fire by unknown persons and the fire burnt itself out on 18th August 2011. The cleanup of residual impacted areas, which was originally planned for completion in October 2011, was suspended on 18th October 2011 due to community issues. This is the 6th sabotage incident at Ikarama since the beginning of August 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 7th February 2012. Download Photo Download JIV Report
16-Aug-11 8" Obigbo - New Elelenwo Delivery line at Akpajo 19-Aug-11 Land Operational
28 Recovery of spilled volume commenced on 19th August and was completed on 30th August 2011. Cleanup of residual impacted area was completed on 14th October 2011. Overall schedule considers timeline required for community contracting. Post Cleanup Inspection completed on 19th October 2011. Download Photo Download JIV Report
17-Aug-11 24" Nembe Creek Pipeline at Tora 22-Aug-11 Swamp Operational 479.49 Recovery of spilled volume commenced on 22nd August 2011 and was completed on 23rd September 2011. Cleanup of residual impacted area was completed on 26th December 2011. JIV took place from 22nd to 26th August 2011. Delays experienced due to community contracting and the difficult work terrain, particularly during the rains. Post Cleanup Inspection completed on 25th May 2012. Download Photo Download JIV Report
20-Aug-11 10" Diebu Creek - Nun River Pipeline at Oporoma 1-Sep-11 Swamp Sabotage / Theft 89 Containment in place on 21st August 2011. Recovery of spilled volume and Cleanup of residual impacted area commenced on 14th September 2011 and was completed on 31st December 2011 Containment was removed by unknown persons prior to the Joint Investigation Visit. Post Cleanup Inspection completed on 27th March 2011. Download Photo Download JIV Report
21-Aug-1 12" Adibawa-Okordia Pipeline at Ikarama 26-Aug-11 Land Sabotage / Theft 30 Recovery of spilled volume commenced on 26th August 2011 and was completed on 11th November 2011. Cleanup of residual impacted area completed on 12th December 2011. This is the 7th sabotage incident at Ikarama since the beginning of August 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 7th February 2012. Download Photo Download JIV Report
21-Aug-11 12" Adibawa-Okordia Pipeline at Ikarama 27-Aug-11 Land Sabotage / Theft 120 Recovery of spilled volume and Cleanup of residual impacted area completed on 3rd October 2011. Post Cleanup Inspection completed on 25th November 2011. This is the 8th sabotage incident at Ikarama since the beginning of August 2011. Initial volume of spill estimated during JIV of 27th August 2011 was 76.9 bbls. However, 84 bbls of oil was subsequently recovered, resulting in a restated volume of 120 bbls. Restated volume has been communicated to the Regulators as per statutory requirement. Download Photo Download JIV Report
22-Aug-11 14" Okordia-Rumuekpe Pipeline at Ikarama 29-Aug-11 Land Sabotage / Theft 91.9 Recovery of spilled volume commenced on 29th August 2011 and was completed on 25th November 2011. Cleanup of residual impacted area was completed on 16th December 2011. This is the 9th sabotage incident at Ikarama since the beginning of August 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 7th February 2012. Download Photo Download JIV Report
22-Aug-11 16" Egbema-Assa Pipeline at Ekpeagha 27-Aug-11 Land Sabotage / Theft 2 Recovery of spilled volume completed on 30th August 2011. Cleanup of residual impacted area completed on 20th of September 2011. Post Cleanup Inspection completed on 27th October 2011. Download Photo Download JIV Report
23-Aug-11 6" Utorogu - Ughelli West Gasline at Iwhrekan 25-Aug-11 Land Operational 6.65 Recovery of spilled volume commenced on 25th August 2011 and was completed on 3rd October 2011. Cleanup of residual impacted area completed on 30th November 2011. Post cleanup inspection completed on 30th December 2011. Download Photo Download JIV Report
23-Aug-11 10" Ekulama-Sanbarth Pipeline at Sanbarth 28-Aug-11 Swamp Operational 0.93 No recoverable oil was found on site. Assessment of impacted area was completed on 28th August 2011. Cleanup of residual impacted area completed on 29th October 2011. The JIV of 28th August revealed that a cofferdam was required in order to ascertain the cause of spill. Following construction of the cofferdam, a conclusive JIV was held on 22nd September 2011. Overall schedule considers community contracting and the difficult work terrain, particularly during the rainy season. Post Cleanup Inspection completed on 3rd November 2011. Download Photo Download JIV Report
26-Aug-11 10" Utorogu - UPS trunkline at Ughevwughe 28-Aug-11 Land Operational 0.17 No recoverable oil was found on site. Cleanup of residual impacted area completed on 29th of September 2011. Post Cleanup Inspection completed on 7th October 2011. Download Photo Download JIV Report
27-Aug-11 12" Imo River - Ogale Pipeline at Komkom 19-Nov-11 Land Sabotage / Theft 167.12 Recovery of spilled volume commenced on 19th November 2011 and was completed on 11th December 2011. Cleanup of residual impacted area was completed on 6th January 2012 Delay in JIV resulted from a protracted shutdown of Imo River pipeline for security reasons. Post Cleanup Inspection completed on 3rd February 2012. Download Photo Download JIV Report
29-Aug-11 20" Kolocreek-Rumuekpe Pipeline at Ogbogolo 4-Sep-11 Land Operational 82.6 Recovery of spilled volume commenced on 9th September 2011 and was completed on 29th September 2011. Cleanup of residual impacted area commenced on 20th October 2011 and was completed on 14th November 2011. JIV commenced on 4th September and was completed on 11th September 2011. Post Cleanup Inspection completed on 22nd November 2011. Download Photo Download JIV Report
31-Aug-11 Well 4T at Ogini 9-Sep-11 Land Operational 0.02 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report