Spills data for January 2022

All download files are in PDF format and open in a new window.

January 2022
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Recovered Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Jan 04, 2022 18'' Assa Rumuekpe Pipeline at Rumuekpe Jan 06, 2022 Land Sabotage 154 n/a Spill was contained on 06 Jan 2022, no recoverable oil found, assessment planned to be completed in Dec 2022 - Download Download
Jan 04, 2022 12''Oguta Egbema Pipeline at Eziorsu Jan 08, 2022 Land Sabotage 4 n/a Spill was contained on 08 Jan 2022, no recoverable oil found, assessment planned to be completed in Dec 2022 - Download Download
Jan 17, 2022 10'' Diebucreek - NunRiver Pipeline at Oporoma_ Eniwari_Onyoma Jan 20, 2022 Swamp Sabotage 89 64 Recovery completed on 07 Feb 2022, assessment planned to be completed in Jun 2022 - Download Download
Jan 19, 2022 20'' Kolocreek - Rumuekpe Pipeline KM 8 at Odau Jan 22, 2022 Land Sabotage 179 170 Recovery completed on 30 Jan 2022, assessment planned to be completed in Jun 2022 - Download Download
Jan 19, 2022 Afam Well 25 Flowline ROW at Egberu Jan 22, 2022 Land Sabotage 2 n/a No recoverable oil found, assessment planned to be completed in Jun 2022 - Download Download
Jan 19, 2022 20'' Rumuekpe - Nkpoku Pipeline at Adanta-Isiokpo Jan 19, 2022 Land Sabotage 0.9 n/a No recoverable oil found, assessment planned to be completed in Jun 2022 - Download Download
Jan 20, 2022 24'' Trans Escravos Pipeline at Obotobo Jan 21, 2022 Swamp Sabotage 0.5 n/a No recoverable oil found, assessment planned to be completed in Jun 2022 - Download Download
Jan 21, 2022 Forcados Single Bouy Mooring (SBM)2 at Ogulagha Jan 27, 2022 Water Operational 2 1.67 Recovery completed on 25 Jan 2022, assessment planned to be completed in Jun 2022 Oil sheen observed on water is suspected to be as a result of splashes from the moonpool cavity due to the turbulent nature of the ocean. Download Download
Jan 25, 2022 4'' Imo River Well 26L Flowline at Owaza Jan 30, 2022 Land Sabotage 1 0.5 Recovery completed on 30 Jan 2022, assessment planned to be completed in Jun 2022 - Download Download