Spills data for December 2021

All download files are in PDF format and open in a new window.

December 2021
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Recovered Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
Dec 01, 2021 36'' Bomu Bonny Pipeline at Eneka Dec 03, 2021 Land Sabotage 1 n/a Spill was contained on 04 Dec 2021, no recoverable oil found, assessment completed on 12 May 2022, clean-up and remediation not required, site certified on 18 Apr 2023, documentation completed on 20 Jul 2023 - Download Download
Dec 07, 2021 6'' Imo River Well 59T Flowline at Igiriukwu-Owaza Dec 15, 2021 Land Sabotage 2 n/a No recoverable oil found, assessment completed on 07 Sep 2022, clean-up and remediation not required, site certification planned to be completed in Jan 2023 - Download Download
Dec 13, 2021 4'' Imo River Well 64L Flowline at Igiriukwu-Owaza Dec 15, 2021 Land Sabotage 3 n/a No recoverable oil found, assessment completed on 06 Jul 2022, clean-up and remediation not required, site certified on 18 Apr 2023, documentation completed on 20 Jul 2023 - Download Download
Dec 19, 2021 Forcados Terminal Skimming Pit at Ogulagha Dec 23, 2021 Land Operational 6 4 Spill was contained on 23 Dec 2021, recovery completed on 04 Jan 2022, assessment completed on 30 Aug 2022, clean-up and remediation not required, site certification planned to be completed in Jan 2023 - Download Download
Dec 29, 2021 20" Kolocreek Rumuekpe Pipeline at Odau Dec 31, 2021 Land Sabotage 658 585 Spill was contained on 31 Dec 2021, recovery completed on 29 Jan 2022, assessment completed on 19 Jul 2022, clean-up and remediation not required, site certification planned to be completed in Dec 2022 Spill volume adjusted subsequent to JIV based on additional information gained during recovery operations Download Download
Dec 30, 2021 14" Okordia-Rumuekpe Pipeline at Ukpeliede Jan 01, 2022 Land Sabotage 6 8 Recovery completed on 11 Jan 2022, assessment completed on 30 Jun 2022, clean-up and remediation not required, site certification planned to be completed in Dec 2022 - Download Download
Dec 31, 2021 20" Kolocreek Rumuekpe Pipeline at Odau Dec 31, 2021 Land Sabotage 10 8 Recovery completed on 20 Jan 2022, assessment completed on 19 Jul 2022, clean-up and remediation not required, site certification planned to be completed in Dec 2022 - Download Download