June 2012
Spills data for June 2012
All download files are in PDF format and open in a new window.
Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report * |
---|---|---|---|---|---|---|---|---|---|
4-Jun-12 | 18" Assa - Rumuekpe Trunkline at Omudioga. | 7-Jun-12 | Land | Sabotage / Theft | 2 | Recovery of spilled volume was completed on 7th June 2012. Initial Cleanup of residual impacted area was completed on 18th August 2012. Remediation was completed on 6th September 2012. | Site certification completed on 10th October 2012. | Download Photo | Downlaod JIV Report |
6-Jun-12 | 24" Nembe Creek - Cawthorne Channel Pipeline at Sego manifold | 8-Jun-12 | Swamp | Sabotage / Theft | 561.2 | Recovery of spilled volume was completed on 15th June 2012. Initial Cleanup of residual impacted area was completed on 25th August 2012. | JIV lasted for 4days (8th through 13th June 2012) to cover multiple leak points over a large area. Site certification was completed on 7th December 2012. | Download Photo | Downlaod JIV Report |
7-Jun-12 | 10" Diebu Creek Pipeline at Onyoma | 23-Jun-12 | Swamp | Sabotage / Theft | 55.4 | Containment in place. Recovery of spilled volume which was stalled by community issues between 23rd June 2012 and 8th July 2012, was completed on 13th July 2012. Initial Cleanup of residual impacted area was completed on 13th December 2012. | JIV was delayed due to a community dispute over ownership of the impacted area. Site Certification completed on 13th March 2013. | Download Photo | Downlaod JIV Report |
8-Jun-12 | 24” Nkpoku-Bomu Pipeline at Bera. | 9-Jun-12 | Land | Sabotage / Theft | 34.3 | Recovery of spilled volume was completed on 12th June 2012. Initial Cleanup of residual impacted area was completed on 25th August 2012. Remediation completed 19th September 2012. | Site certification completed on 10th October 2012. | Download Photo | Downlaod JIV Report |
9-Jun-12 | 24" Cawthorne Channel - Bonny Block Valve Station at Kalibiama | 11-Jun-12 | Swamp | Sabotage / Theft | 7.31 | No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 2nd October 2012. | Site certification completed on 17th December 2012. | Download Photo | Downlaod JIV Report |
9-Jun-12 | 20" Rumuekpe – Nkpoku Trunkline at Ibaa | 16-Jun-12 | Land | Sabotage / Theft | 200.2 | Recovery of spilled volume commenced on 16th June 2012 and was completed on 31st July 2012. Initial Cleanup of residual impacted area was completed on 29th August 2012. | Site Certification completed on 18th January 2012. | Download Photo | Downlaod JIV Report |
14-Jun-12 | Obigbo Well 28L/S Flowline at Obigbo | 15-Jun-12 | Land | Sabotage / Theft | 0.4 | No recoverable oil was found on site. | JIV recommends no further cleanup action required. Closed. Site Certification was completed on 20th August 2013. | Download Photo | Downlaod JIV Report |
14-Jun-12 | Obigbo Well 3L Flowline at Umuebulu | 15-Jun-12 | Land | Operational | 0.11 | No recoverable oil was found on site. | JIV recommends no further cleanup action required. Closed. Site certification was completed on 10th October 2012. | Download Photo | Downlaod JIV Report |
14-Jun-12 | 24" Nkpoku - Bomu Pipeline at Ogale | 15-Jun-12 | Land | Operational | 0.92 | No recoverable oil was found on site.Cleanup of residual impacted area was completed on 5th September 2014. | Delays due to protracted Community contracting. Site Certification completed on 27th February 2015. | Download Photo | Downlaod JIV Report |
15-Jun-12 | Imo River 1 Well 59T Flowline RoW at Owaza | 15-Jun-12 | Land | Sabotage / Theft | 4.3 | No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 12th September 2012. Remediation was completed on 2nd October 2012. | Site Certification was completed on 17th December 2012. | Download Photo | Downlaod JIV Report |
16-Jun-12 | Agbada 2 Well 69S Flowline at Umuokwa | 17-Jun-12 | Land | Sabotage / Theft | 1.3 | Recovery of spilled volume was completed on 17th June 2012. Initial cleanup of residual impacted area was completed on 19th September 2012. Remediation completed on 17th October 2012. | Site certification was completed on 23rd November 2012. | Download Photo | Downlaod JIV Report |
18-Jun-12 | 24" Nkpoku - Bomu Pipeline at Nonwa | 20-Jun-12 | Land | Sabotage / Theft | 326.5 | Recovery of spilled volume was completed on 22nd June 2012. Initial cleanup of residual impacted area was completed on 31st August 2012. | Site Certification completed on 30th April 2013. | Download Photo | Downlaod JIV Report |
19-Jun-12 | Ebubu Ejema Well 5/9 Flow Line at Ejama | 19-Jun-12 | Land | Operational | 0.001 | No recoverable oil was found on site. | Spill size was approximately one litre of crude from a disused pipeline. JIV recommends no further cleanup action required. Closed. Site certification completed on 13th November 2012. | Download Photo | Downlaod JIV Report |
21-Jun-12 | 24" Alakiri - Bonny Pipeline (GPHSL) at Fusokiri / Ilomatoru | 24-Jun-12 | Swamp | Operational | 9.5 | Recovery of spilled volume was completed on 7th August 2012. Cleanup of residual impacted area was completed on 9th July 2013. | Spill was originally reported as a water leak. JIV investigation was delayed due to construction of a cofferdam from 22nd June to 22nd July 2012. JIV commenced on 24th July with a plan to cover approx 1.8km of pipeline. On 2nd August, water was injected into the line under pressure and 4 drilled holes were identified. On 5th August, an Oil leak point was located. JIV was completed on the 7th August 2012. Site Certification was completed on 20th August 2013. | Download Photo | Downlaod JIV Report |
25-Jun-12 | 24" Nkpoku - Bomu Pipeline at Botem | 26-Jun-12 | Land | Sabotage / Theft | 0.64 | Recovery of spilled volume was completed on 27th June 2012. Initial clean up of residual impacted area was completed on 23rd July 2012 | Site certification completed on 30th June 2013. | Download Photo | Downlaod JIV Report |
25-Jun-12 | Imo River 3 Well 5 W/h Location at Igrukwu | 26-Jun-12 | Land | Operational | 21.5 | Containment in place. Recovery of spilled volume was completed on 26th July 2012. Initial Cleanup of residual impacted area was completed on 15th April 2013. | Site Certification was completed on 29th April 2013. | Download Photo | Downlaod JIV Report |
25-Jun-12 | 24" Bomu - Bonny Pipeline at Bodo West | 29-Jun-12 | Swamp | Sabotage / Theft | 1.4 | No recoverable oil was found on site. | Delay in conclusion of the JIV process was due to community disturbance and Security Issues. | Download Photo | Downlaod JIV Report |
25-Jun-12 | 28" Nkpoku -Bomu Pipeline at Gio | 26-Jun-12 | Land | Sabotage / Theft | 158.2 | Recovery was completed on 29th June 2012. Initial cleanup of residual impacted area completed on 22nd April 2013. | The spill incident was accompanied by fire which burnt itself out. The JIT discovered two illegally attached lines on the 28” Nkpoku-Bomu pipeline. The area of impact, which extended into a nearby illegal settlement, could not be mapped completely at the first attempt due to security issues. JIV was completed on 12th July 2012. Site certification completed on 30th June 2013. | Download Photo | Downlaod JIV Report |
25-Jun-12 | Opukushi Well 24T Flowline ROW | 25-Jun-12 | Swamp | Operational | 106.3 | Recovery of spilled volume commenced on 24th June 2012 and was completed on 14th July 2012. Initial cleanup of residual impacted area was completed on 14th October 2012. | The JIV was conducted in two phases, first to estimate the spill volume on 25th June 2012, and on 30th June 2012, to determine the cause of spill after the spill point was made accessible. Site certification completed on 21st November 2012. | Download Photo | Downlaod JIV Report |
27-Jun-12 | 24" Alakiri - Bonny Trunkline at Kalaibiama | 18-Aug-12 | Swamp | Sabotage / Theft | 24.3 | Recovery of spilled volume was completed on 20th August 2012. Initial Cleanup of residual impacted area was completed on 14th November 2012. Remediation was completed on 17th November 2012. | Delay in JIV due to construction of a Cofferdam to access the spill point. Overall schedule considers impact of the rainy season. Site certification completed on 17th December 2012. | Download Photo | Downlaod JIV Report |
29-Jun-12 | 4" Obele - Ibaa Pipeline at Ibaa. | 02-July-12 | Land | Sabotage / Theft | 6.1 | Containment in place. No recoverable oil was found on site. | Site certification was completed on 23rd November 2012. | Download Photo | Downlaod JIV Report |
30-Jun-12 | Awoba Well 8T at Awoba | 10-Aug-12 | Swamp | YTD | NA | No recoverable oil was found on site. | An initial attempt was made to carry out a JIV on 26th July 2012, but without success, due to constraints resulting from a cluster of pipelines at a river crossing. Another JIV on 10th August 2012 recommended further investigation in order to determine whether a spill occurred and if so, establish the cause. | Download Photo | Downlaod JIV Report |