January 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
16-Jan-12 Opukushi Well 33L Right Of Way at Opukushi 19-Jan-12 Swamp Operational
2 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 30th April 2012. The JIV was conducted in two phases, first to estimate the spill volume on 19th January 2012, and on 27th January 2012, to determine the cause of spill after the spill point was made accessible. Site Certification was completed on 4th May 2012.
Download Photo Download JIV Report
16-Jan-12
8" Cawthorne Channel II Pipeline at Tigerkiri 21-Jan-12 Swamp Sabotage / Theft
3.6 Recovery of spilled volume was completed on 17th Jan 2012. Initial cleanup of residual impacted area was completed on 17th February 2012. Site re-impacted following a new spill incident at the same location on 22nd May 2012. Further work to be reported under the new incident. This incident is now considered closed. Download Photo Download JIV Report
18-Jan-12 36" Nkpoku - Bomu Pipeline at Eneka 20-Jan-12 Land Sabotage / Theft 13 Recovery of spilled volume was completed on 23rd Jan 2012. Initial cleanup of residual impacted area was completed on 10th February 2012. Site remediation was completed on 9th April 2012. Site Certification was completed on 29th June 2012.
Download Photo Download JIV Report
20-Jan-12 16" Egbema - Assa Trunk line at Obille 25-Jan-12 Land Sabotage / Theft 1.3 No recoverable oil was found on site JIV recommends no further action required. Closed. Site Certification completed on 3rd May 2012. Download Photo Download JIV Report
23-Jan-12 Etelebou Well 11T at Etelebou 24-Jan-12 Land Sabotage / Theft 98.5 Containment in place. Recovery of spilled volume commenced on 31st January 2012 and was completed on 6th February 2012. Initial cleanup of residual impacted area was completed on 26th February 2012. Remediation was completed on 15th September 2012. The incident was followed by fire which consumed most of the spilled oil. Initial delays due to flooding. Site Certification was completed on 11th February 2013. Download Photo Download JIV Report
25-Jan-12 8" Umuechem - Nkpoku Pipeline at Omunwei, Igwuruta 26-Jan-12 Land Sabotage / Theft 2.4 Recovery of spilled volume was completed on 26th Jan 2012. Initial cleanup of residual impacted area was completed on 8th February 2012. Remediation was completed on 23rd June 2012. Incident was followed by fire which consumed most of the spilled oil. Site certification was completed on 12th October 2012. Download Photo Download JIV Report
27-Jan-12 Ubie Well 9S flowline at Idu/Edrass 27-Jan-12 Land Sabotage / Theft 7.3 Recovery of spilled volume commenced on 8th February 2012 and was completed on 24th February 2012. Initial Cleanup of residual impacted area was completed on 14th March 2012. Site Remediation was completed on 14th June 2012. Site certification was completed on 13th August 2012.
Download Photo Download JIV Report
28-Jan-12 16" Egbema-Assa Trunk line at Assa 2-Feb-12 Land Sabotage / Theft 4.7 Recovery of spilled volume was completed on 4th February 2012. Initial Cleanup of residual impacted area was completed on 9th March 2012. Site Remediation was completed on 12th March 2012. Site certification was completed on 13th August 2012. Download Photo Download JIV Report