Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report * |
---|---|---|---|---|---|---|---|---|---|
1-Feb-12 | 6"Obigbo North Pipeline at Ogale | 3-Feb-12 | Land | Sabotage / Theft | 120 | Recovery of spilled volume was completed on 6th February 2012. Initial Cleanup of residual impacted area was completed on 14th March 2012. | Site Certification was completed on 24th December 2012. | Download Photo | Download JIV Report |
7-Feb-12 | 28" Nkpoku - Bomu Pipeline at B-Dere | 11-Feb-12 | Land | Sabotage / Theft | 112.2 | Recovery of spilled volume commenced on 15th February 2012 and was completed on 11th April 2012. Initial Cleanup of residual impacted area was completed on 31st May 2012. | JIV took place from 11th to 14th February 2012. The site was re-impacted by third party oil spills and SPDC has informed the relevant authorities. This site is being remediated as part of the Greater Bodo Area Clean-up, as it is linked to the creek system in which extensive oil theft and illegal refining activities take place. Site Certification was completed on 3rd April 2013. | Download Photo | Download JIV Report |
7-Feb-12 | 28" Nkpoku - Bomu Pipelline at B-Dere | 14-Feb-12 | Land | Sabotage / Theft | 0.22 | No recoverable oil was found on site. |
JIV recommended that no cleanup action is required. Closed. Site Certification completed on 3rd May 2012. | Download Photo | Download JIV Report |
10-Feb-12 | 6" Obigbo North - Ogale delivery line at Ogale | 15-Feb-12 |
Land | Sabotage / Theft | 01.2 | No recoverable oil was found on site. Initial Cleanup of residual impacted area completed on 14th March 2012. | Site Certification was completed on 24th December 2012. |
Download Photo | Download JIV Report |
10-Feb-12 | 12" Imo River 2 Pipeline at Owaza |
15-Feb-12 | Land | Sabotage / Theft | 2.1 | Recovery of spilled volume was completed on 15th February 2012. Initial Cleanup of residual impacted area completed on 14th March 2012. | Site Certification completed on 3rd May 2012. | Download Photo | Download JIV Report |
10-Feb-12 | Diebu Creek Well 15T Flow Line at Diebu Creek |
15-Feb-12 | Swamp | Sabotage / Theft | 2 |
No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 17th March 2012. | Site Certification completed on 3rd May 2012. | Download Photo | Download JIV Report |
13-Feb-12 | 12" Adibawa - Okordia delivery line at Edegbari | 9-Mar-12 | Land | Operational | 0.3 | No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 14th March 2012. Site Remediation completed on August 2012. | The leak occurred during pressure testing of the pipeline to confirm its integrity. An initial JIV on 19th February 2012 could not assess the point of spill. A conclusive JIV was held on 9th March 2012. Initial delays due to flooding. Site Certification completed on 11th February 2013. | Download Photo | Download JIV Report |
15-Feb-12 | 12" Oguta - Egbema Pipeline at Obiakpu | 19-Feb-12 | Land | Sabotage / Theft | 2,025.6 | Recovery of spilled volume commenced on 19th February 2012 and was completed on 28th February 2012. Initial Cleanup of residual impacted area was completed on 30th April 2012. Remediation was completed on 10th October 2012. | Whilst awaiting certification, Site re-impacted by a new spill at the same location on 20th May 2013. Further work to be reported under the new incident listing. This incident is now considered closed. | Download Photo | Download JIV Report |
19-Feb-12 | 36" Nkpoku - Bomu Trunkline at Agbonchia | 23-Feb-12 | Land |
Sabotage / Theft | 156.8 | Recovery of spilled volume commenced on 22nd February 2012 and was completed 9th March 2012. Initial Cleanup of residual impacted area was completed on 30th April 2012. | Site Certification was completed on 28th December 2012. | Download Photo | Download JIV Report |
20-Feb-12 | Kanbo Well 5L Right of Way | 1-Mar-12 | Swamp | Operational | 0.08 | No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 23rd April 2012. | JIV was delayed due to break down of the Swamp Buggy required to access the underwater spill point. Site Certification completed on 4th May 2012. | Download Photo | Download JIV Report |
20-Feb-12 | 18" Assa - Rumuekpe Trunkline at Awara | 24-Feb-12 | Land | Operational | 2 | No recoverable oil was found on site. Initial cleanup of residual impacted area was completed on 28th February 2012. | JIV spanned 2 days, 24th through 25th February 2012. Site certification was completed on 25th June 2012. | Download Photo | Download JIV Report |
20-Feb-12 | 6" Obigbo North - Ogale pipeline at Komkom | 24-Feb-12 | Land | Sabotage / Theft |
103.2 | Recovery of spilled volume was completed on 25th February 2012. Initial Cleanup of residual impacted area completed on 14th March 2012. | Site re-impacted following a spill incident at the same location on 30th October 2013. Further work will now be reported under the new incident listing. This incident is now considered closed. | Download Photo | Download JIV Report |
21-Feb-12 | 28" Nkpoku -Bomu Pipeline at Aleto-Nchia-Eleme | 16-Mar-12 | Land | Sabotage / Theft | 2755 | Recovery of spilled volume commenced on 26th February 2012 and was completed on 25th March 2012. Initial Cleanup of residual impacted area was completed on 17th May 2012. | JIV commenced on 26th February 2012 and was concluded on 16th March 2012. Delay due to time required to depressurize the line and safely expose the spill point for inspection and repair. Site Certification was completed on 28th December 2012. | Download Photo | Download JIV Report |
23-Feb-12 | 10" Ekulama 2 Pipeline at Sanbarth / Luckyland | 11-Apr-12 | Swamp | Operational | 5.5 | Recovery of spilled volume was completed on 12th April 2012. Initial Cleanup of residual impacted area was completed on 3rd May 2012. | JIV was delayed due to security reasons and the need to construct a Cofferdam. Site Certification was completed on 29th August 2012. | Download Photo | Download JIV Report |
27-Feb-12 | SPM 3 Bonny Crude Loading Platform Offshore | 27-Feb-12 | Water | Operational | 14 |
No recoverable oil was found on site. | JIV recommends no cleanup action required. Closed. Site Certification was completed on 28th August 2012. | Download Photo | Download JIV Report |