September 2011
Spills data for September 2011
All download files are in PDF format and open in a new window.
Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report * |
---|---|---|---|---|---|---|---|---|---|
1-Sep-11 | Well 34T Flowline at Opukushi | 6-Sep-11 | Swamp | Operational | 4.64 | Containment in place. Recovery of spilled volume completed on 18th September 2011. Cleanup of residual impacted area completed on 23rd of September 2011. | Post Cleanup inspection completed on 12th October 2011. | Download Photo | Download JIV Report |
3-Sep-11 | 14" Okordia-Rumuekpe Pipeline at Ikarama | 9-Sep-11 | Land | Sabotage / Theft | 68.7 | Recovery of spilled volume commenced on 12th September 2011 and was completed on 26th November 2011. Cleanup of residual impacted area was completed on 16th December 2011. | This is the 10th sabotage incident at Ikarama since the beginning of August 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 8th February 2012. | Download Photo | Download JIV Report |
5-Sep-11 | 18" Assa-Rumuekpe Pipeline at Elele-Amini | 13-Sep-11 | Land | Sabotage / Theft | 155 | Recovery of spilled volume completed on 14th September 2011. Cleanup of residual impacted area completed on 20th September 2011. | Post cleanup inspection completed on 24th October 2011. | Download Photo | Download JIV Report |
7-Sep-11 | Well 4T Flowline at Batan | 12-Sep-11 | Swamp | Operational | 1.22 | No recoverable oil was found on site. | JIV recommends no cleanup action required. Closed. | Download Photo | Download JIV Report |
8-Sep-11 | Nun River Well 15 Flowline at Onyonma | 14-Sep-11 | Swamp | Sabotage / Theft | 3.5 | Containment in place. Recovery of spilled volume commenced on 27th September 2011 and was completed on 16th October 2011. Cleanup of residual impacted area was completed on 18th December 2011. | The cleanup of residual impacted areas, which was originally planned for completion in October 2011, was suspended due to denial of access by the community. Site re-impacted following the Nun River Well 15 Flowline leak incident at Onyonma on 21st December 2011 . This incident is now closed. Clean up progress monitoring shall be via entry for the more recent incident of 21Jan2012. Post Cleanup Inspection completed on 26th March 2012. | Download Photo | Download JIV Report |
12-Sep-11 | Imo River 3 Well 1 Flowline at Ipu-West | 14-Sep-11 | Land | Sabotage / Theft | 11.3 | Recovery of spilled volume commenced on 24th September 2011 and was completed on 25th September 2011. Cleanup of residual impacted area completed on 10th October 2011. | Post Cleanup Inspection completed on 30th November 2011. | Download Photo | Download JIV Report |
13-Sep-11 | Adibawa Well 10 S Flowline at Edagberi | 15-Sep-11 | Land | Sabotage / Theft | 1 | No recoverable oil was found on site. Cleanup of residual impacted area completed on 18th November 2011. | Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 8th February 2012. | Download Photo | Download JIV Report |
13-Sep-11 | Akaso Well 10S Flowline at Mbiama | 16-Sep-11 | Swamp | Sabotage / Theft | 0.81 | No recoverable oil was found on site and reassessment revealed no residual impact. | Post Cleanup Inspection completed on 24th November 2011. | Download Photo | Download JIV Report |
16-Sep-11 | Jones Creek Well Head 23S/L at Kokodiagbene | 20-Sep-11 | Swamp | Sabotage / Theft | 9.88 | Recovery completed on the 30th of September 2011. Cleanup of residual impacted area commenced on 17th November 2011 and was completed on 21st November 2011. | Post Cleanup Inspection completed on 6th December 2011. | Download Photo | Download JIV Report |
18-Sep-11 | 20" Kolocreek-Rumuekpe Pipeline at Ogbogolo | 23-Sep-11 | Land | Operational | 36 | Containment in place. Recovery of spilled volume commenced on 26th September 2011 and was completed on 29th September 2011. Cleanup of residual impacted area commenced on 20th October 2011 and was completed on 14th November 2011. | Post Cleanup Inspection completed on 23rd November 2011. | Download Photo | Download JIV Report |
19-Sep-11 | 28" Trans Forcados Pipeline at Batan axis | 23-Sep-11 | Swamp | Operational | 8.79 | No recoverable oil was found on site. Cleanup of residual impacted area commenced on 3rd December 2011 and was completed on 20th December 2011. | Cleanup of residual impacted area was planned for completion in December 2011. Overall schedule considered community contracting and the difficult work terrain, particularly during the rainy season. Post Cleanup Inspection completed on 21st December 2011. | Download Photo | Download JIV Report |
21-Sep-11 | 6" Obigbo North - Ogale Pipeline at Ogale | 22-Sep-11 | Land | Sabotage / Theft | 0.95 | No recoverable oil was found on site. | JIV recommends no cleanup action required. Closed. | Download Photo | Download JIV Report |
23-Sep-11 | 6" Obigbo North Pipeline at Ogale | 24-Sep-11 | Land | Sabotage / Theft | 0.41 | No recoverable oil was found on site. | JIV recommends no cleanup action required. Closed. | Download Photo | Download JIV Report |
29-Sep-11 | Well 3T at Escravos | 30-Sep-11 | Land | Operational | 1.33 | Recovery of spilled volume commenced on 30th September 2011 and was completed on 1st October 2011 . Cleanup of residual impacted area completed on 2nd October 2011. | Post Cleanup Inspection completed on 30th November 2011. | Download Photo | Download JIV Report |
30-Sep-11 | Cawthorne Channel Well 43S Flowline at Cawthorne Channel | 6-Oct-11 | Swamp | Sabotage / Theft | 1.8 | Recovery of spilled volume completed on 8th October 2011. Cleanup of residual impacted area commenced on 25th October 2011 and was completed on 30th October 2011. | Post Cleanup Inspection completed on 24th November 2011. | Download Photo | Download JIV Report |