September 2011
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
1-Sep-11 Well 34T Flowline at Opukushi 6-Sep-11 Swamp Operational 4.64 Containment in place. Recovery of spilled volume completed on 18th September 2011. Cleanup of residual impacted area completed on 23rd of September 2011. Post Cleanup inspection completed on 12th October 2011. Download Photo Download JIV Report
3-Sep-11 14" Okordia-Rumuekpe Pipeline at Ikarama 9-Sep-11 Land Sabotage / Theft 68.7 Recovery of spilled volume commenced on 12th September 2011 and was completed on 26th November 2011. Cleanup of residual impacted area was completed on 16th December 2011. This is the 10th sabotage incident at Ikarama since the beginning of August 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 8th February 2012. Download Photo Download JIV Report
5-Sep-11 18" Assa-Rumuekpe Pipeline at Elele-Amini 13-Sep-11 Land Sabotage / Theft 155 Recovery of spilled volume completed on 14th September 2011. Cleanup of residual impacted area completed on 20th September 2011. Post cleanup inspection completed on 24th October 2011. Download Photo Download JIV Report
7-Sep-11 Well 4T Flowline at Batan 12-Sep-11 Swamp Operational 1.22 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
8-Sep-11 Nun River Well 15 Flowline at Onyonma 14-Sep-11 Swamp Sabotage / Theft 3.5 Containment in place. Recovery of spilled volume commenced on 27th September 2011 and was completed on 16th October 2011. Cleanup of residual impacted area was completed on 18th December 2011. The cleanup of residual impacted areas, which was originally planned for completion in October 2011, was suspended due to denial of access by the community. Site re-impacted following the Nun River Well 15 Flowline leak incident at Onyonma on 21st December 2011 . This incident is now closed. Clean up progress monitoring shall be via entry for the more recent incident of 21Jan2012. Post Cleanup Inspection completed on 26th March 2012. Download Photo Download JIV Report
12-Sep-11 Imo River 3 Well 1 Flowline at Ipu-West 14-Sep-11 Land Sabotage / Theft 11.3 Recovery of spilled volume commenced on 24th September 2011 and was completed on 25th September 2011. Cleanup of residual impacted area completed on 10th October 2011. Post Cleanup Inspection completed on 30th November 2011. Download Photo Download JIV Report
13-Sep-11 Adibawa Well 10 S Flowline at Edagberi 15-Sep-11 Land Sabotage / Theft 1 No recoverable oil was found on site. Cleanup of residual impacted area completed on 18th November 2011. Schedule revised due to a nationwide industrial action by labour unions in January 2012. Post Cleanup Inspection completed on 8th February 2012. Download Photo Download JIV Report
13-Sep-11 Akaso Well 10S Flowline at Mbiama 16-Sep-11 Swamp Sabotage / Theft 0.81 No recoverable oil was found on site and reassessment revealed no residual impact. Post Cleanup Inspection completed on 24th November 2011. Download Photo Download JIV Report
16-Sep-11 Jones Creek Well Head 23S/L at Kokodiagbene 20-Sep-11 Swamp Sabotage / Theft 9.88 Recovery completed on the 30th of September 2011. Cleanup of residual impacted area commenced on 17th November 2011 and was completed on 21st November 2011. Post Cleanup Inspection completed on 6th December 2011. Download Photo Download JIV Report
18-Sep-11 20" Kolocreek-Rumuekpe Pipeline at Ogbogolo 23-Sep-11 Land Operational 36 Containment in place. Recovery of spilled volume commenced on 26th September 2011 and was completed on 29th September 2011. Cleanup of residual impacted area commenced on 20th October 2011 and was completed on 14th November 2011. Post Cleanup Inspection completed on 23rd November 2011. Download Photo Download JIV Report
19-Sep-11 28" Trans Forcados Pipeline at Batan axis 23-Sep-11 Swamp Operational 8.79 No recoverable oil was found on site. Cleanup of residual impacted area commenced on 3rd December 2011 and was completed on 20th December 2011. Cleanup of residual impacted area was planned for completion in December 2011. Overall schedule considered community contracting and the difficult work terrain, particularly during the rainy season. Post Cleanup Inspection completed on 21st December 2011. Download Photo Download JIV Report
21-Sep-11 6" Obigbo North - Ogale Pipeline at Ogale 22-Sep-11 Land Sabotage / Theft 0.95 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
23-Sep-11 6" Obigbo North Pipeline at Ogale 24-Sep-11 Land Sabotage / Theft 0.41 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
29-Sep-11 Well 3T at Escravos 30-Sep-11 Land Operational 1.33 Recovery of spilled volume commenced on 30th September 2011 and was completed on 1st October 2011 . Cleanup of residual impacted area completed on 2nd October 2011. Post Cleanup Inspection completed on 30th November 2011. Download Photo Download JIV Report
30-Sep-11 Cawthorne Channel Well 43S Flowline at Cawthorne Channel 6-Oct-11 Swamp Sabotage / Theft 1.8 Recovery of spilled volume completed on 8th October 2011. Cleanup of residual impacted area commenced on 25th October 2011 and was completed on 30th October 2011. Post Cleanup Inspection completed on 24th November 2011. Download Photo Download JIV Report