October 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
01-Oct-12 28" Trans Niger Pipeline at Okolo 05-Oct-12 Swamp Sabotage / Theft 88.4 Recovery of spilled volume commenced on 9th October 2012 and was completed on 24th October 2012. Initial cleanup of residual impacted area completed on 10th June 2013. JIV commenced on 5th October 2012 and was completed on 20th October 2012. JIV delayed to enable extinguishing of fire on sea going tanker loaded with stolen crude. Site certification was completed on 20th August 2013. Download Photo Download JIV Report
15-Oct-12 16'' Eriemu - Ughelli Pumping Station Pipeline at Ekuigbo 16-Oct-12 Land Sabotage / Theft 0.4 Recovery of spilled volume completed on 16th October 2012. Initial Cleanup of residual impacted area was completed on 23rd November 2012. Remediation was completed on 30th November 2012. Site certification was completed on 12th December 2012. Download Photo Download JIV Report
21-Oct-12 Otumara Well 20L Flowline at Ugboegungun 24-Oct-12 Swamp Operational 71 Containment in place. Recovery of spilled volume completed on 18th November 2012. Initial Cleanup of residual impacted area was completed on 7th February 2013. Remediation was completed on 18th February 2013. Site Certification completed on 2nd April 2013. Download Photo Download JIV Report
22-Oct-12 28" Nkpoku - Bomu Trans Niger Pipeline at Elelenwo 24-Oct-12 Land Sabotage / Theft 7 Recovery of spilled volume completed on 30th October 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. Site Certification was completed on 30th April 2013. Download Photo Download JIV Report
22-Oct-12 28" Nkpoku - Bomu Trans Niger Pipeline at Aleto 26-Oct-12 Land Sabotage / Theft 4 Recovery of spilled volume completed on 27th October 2012. Initial Cleanup of residual impacted area was completed on 20th December 2012. Site Certification was completed on 7th May 2013. Download Photo Download JIV Report
23-Oct-12 12" Afiesere - Eriemu Delivery Line at Eriemu Manifold 23-Oct-12 Land Operational 3 Recovery of spilled volume completed on 30th October 2012. Initial Cleanup of residual impacted area was completed on 17th January 2013. Remediation was completed on 23rd January 2013. Schedule was impacted by protracted community contracting. Site Certification was completed on 21st March 2013. Download Photo Download JIV Report
24-Oct-12 20’’ Otumara – Escravos Trunkline at Adjudaibo 25-Oct-12 Swamp Sabotage / Theft 574 Containment in place. Recovery of spilled volume commenced on 5th December 2102. Initial Cleanup of residual impacted area commenced on 18th February 2013 and was completed on 10th March 2013. The incident involved oil spills at two points on the same pipeline and was investigated as two separate JIVs. The estimated volume of oil spilled at Adjudaibo and Ugboegungun was 571 barrels and 3 barrels respectively. Work at Ugboegungun is currently suspended due to continuous oil theft activities at the site. Site Certification completed on 23rd April 2013. Download Photo Download JIV Report
27-Oct-12 12” Imo River 2 Pipeline at Odagwa 28-Oct-12 Land Sabotage / Theft 26 Recovery of spilled volume commenced on 29th October 2012 and was completed on 9th November 2012. Initial Cleanup of residual impacted area was completed on 9th November 2012. Site Certification was completed on 29th April 2013. Download Photo Download JIV Report