November 2011
Date Reported Incident Site JIV Date
Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
1-Nov-11 24'' Trans Ramos Pipeline Right of Way at Aghoro 3-Nov-11 Swamp Others 1.3 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 1st May 2012. Mystery spill (Joint investigation team could not establish the source of spill). Post Cleanup inspection completed on 18th May 2012. Download Photo Download JIV Report
1-Nov-11 24" Nkpoku - Bomu Pipeline at Biara 3-Nov-11 Land Sabotage / Theft 0.23 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
7-Nov-11 Olomoro compressor station saver pit 2 9-Nov-11 Land Operational 3.9 No recoverable oil found on site. Initial cleanup of residual impacted area commenced on 25th February 2012 and was completed on 1st March 2012. This is a recurrence of the incident of 14th June 2011, which has now been closed. Recovery of spilled volume was stalled by lingering intra-community conflicts. Community issues resolved on 20th February 2012. Post Cleanup inspection completed on 16th March 2012. Download Photo Download JIV Report
8-Nov-11 16" Egbema-Assa Pipeline at Assa 13-Nov-11 Land Sabotage / Theft 0.8 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
8-Nov-11 14" Okordia - Rumuekpe Pipeline at Ikarama 11-Nov-11 Land Sabotage / Theft 83.3 Recovery of spilled volume commenced on 11th November 2011. Cleanup of residual impacted area completed on 24th January 2012. This is the 13th sabotage incident at Ikarama since the beginning of August 2011. Overall schedule was impacted by difficulty of terrain. Post Cleanup inspection completed on 7th February 2012. Download Photo Download JIV Report
9-Nov-11 6" Obigbo North - Ogale Pipeline at Ogale 12-Nov-11 Land Sabotage / Theft 24.88 Recovery of spilled volume commenced on 12th November 2011 and was completed on 17th November 2011. Cleanup of residual impacted area completed on 8th December 2011. Post Cleanup inspection completed on 25th January 2012. Download Photo Download JIV Report
12-Nov-11 12" Adibawa - Okordia Pipeline at Ikarama 16-Nov-11 Land Operational 62.2 Recovery of spilled volume commenced on 16th November 2011 and was completed on 28th November 2011. Initial cleanup of residual impacted area completed on 24th February 2012 Post Cleanup Inspection completed on 24th April 2012 Download Photo Download JIV Report
14-Nov-11 Krakama Well 13 at Bille 28-Nov-11 Swamp Operational 22.7 Recovery of spilled volume completed on 27th November 2011. Cleanup of residual impacted area completed on 31st January 2012. Delay due to community contracting and difficulty of the work terrain. Post Cleanup Inspection completed on 23rd May 2012. Download Photo Download JIV Report
15-Nov-11 16'' Uzere-Eriemu Pipeline at Iyede 16-Nov-11 Land Sabotage / Theft 36.5 Recovery of spilled volume commenced on 17th November 2011. Cleanup of residual impacted area commenced on 9th December 2011 but was suspended on 12th December 2011 due to Community issues. Cleanup restarted on 18th January 2012 and was completed on 24th January 2012. Community issues resolved. Post Cleanup inspection completed on 26th January 2012. Download Photo Download JIV Report
21-Nov-11 12" Imo River 2 - Ebubu Pipeline at Odagwa 23-Nov-11 Land Sabotage / Theft 0.26 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
21-Nov-11 6" Obigbo North - OgalePipeline at Ogale 23-Nov-11 Land Sabotage / Theft 6.8 Recovery of spilled volume completed on 23rd November 2011. Cleanup of residual impacted area was completed on 8th December 2011. Post Cleanup inspection completed on 25th January 2012. Download Photo Download JIV Report
23-Nov-11 12” Cawthorne channel I Pipeline at Cawthorne Channel 23-Nov-11 Swamp Operational 3.1 No recoverable oil was found on site. Initial cleanup of residual impacted area completed on 21st April 2012. Post Cleanup Inspection completed on 15th June 2012. Overall schedule was impacted by protracted community contracting and difficult swamp logistics. Download Photo Download JIV Report
24-Nov-11 8'' Northbank - Northbank tie-in Manifold 2-Dec-11 Swamp Operational 77.1 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 23rd April 2012. Post Cleanup Inspection completed on 27th April 2012 Download Photo Download JIV Report
28-Nov-11 12" Imo River 1 - Ogale Pipeline at Owaza 27-Nov-11 Land Sabotage / Theft 1.94 No recoverable oil was found on site at the time of the JIV. JIV took place as part of Imo River axis re-entry effort. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report
28-Nov-11 Awoba Well 8 T Flowline at Bille 6-Dec-11 Swamp
Operational 0.5 No recoverable oil was found on site. JIV recommends no cleanup action required. Closed. Download Photo Download JIV Report