June 2012
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
4-Jun-12 18" Assa - Rumuekpe Trunkline at Omudioga. 7-Jun-12 Land Sabotage / Theft 2 Recovery of spilled volume was completed on 7th June 2012. Initial Cleanup of residual impacted area was completed on 18th August 2012. Remediation was completed on 6th September 2012. Site certification completed on 10th October 2012. Download Photo Downlaod JIV Report
6-Jun-12 24" Nembe Creek - Cawthorne Channel Pipeline at Sego manifold 8-Jun-12 Swamp Sabotage / Theft 561.2 Recovery of spilled volume was completed on 15th June 2012. Initial Cleanup of residual impacted area was completed on 25th August 2012. JIV lasted for 4days (8th through 13th June 2012) to cover multiple leak points over a large area. Site certification was completed on 7th December 2012. Download Photo Downlaod JIV Report
7-Jun-12 10" Diebu Creek Pipeline at Onyoma 23-Jun-12 Swamp Sabotage / Theft 55.4 Containment in place. Recovery of spilled volume which was stalled by community issues between 23rd June 2012 and 8th July 2012, was completed on 13th July 2012. Initial Cleanup of residual impacted area was completed on 13th December 2012. JIV was delayed due to a community dispute over ownership of the impacted area. Site Certification completed on 13th March 2013. Download Photo Downlaod JIV Report
8-Jun-12 24” Nkpoku-Bomu Pipeline at Bera. 9-Jun-12 Land Sabotage / Theft 34.3 Recovery of spilled volume was completed on 12th June 2012. Initial Cleanup of residual impacted area was completed on 25th August 2012. Remediation completed 19th September 2012. Site certification completed on 10th October 2012. Download Photo Downlaod JIV Report
9-Jun-12 24" Cawthorne Channel - Bonny Block Valve Station at Kalibiama 11-Jun-12 Swamp Sabotage / Theft 7.31 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 2nd October 2012. Site certification completed on 17th December 2012. Download Photo Downlaod JIV Report
9-Jun-12 20" Rumuekpe – Nkpoku Trunkline at Ibaa 16-Jun-12 Land Sabotage / Theft 200.2 Recovery of spilled volume commenced on 16th June 2012 and was completed on 31st July 2012. Initial Cleanup of residual impacted area was completed on 29th August 2012. Site Certification completed on 18th January 2012. Download Photo Downlaod JIV Report
14-Jun-12 Obigbo Well 28L/S Flowline at Obigbo 15-Jun-12 Land Sabotage / Theft 0.4 No recoverable oil was found on site. JIV recommends no further cleanup action required. Closed. Site Certification was completed on 20th August 2013. Download Photo Downlaod JIV Report
14-Jun-12 Obigbo Well 3L Flowline at Umuebulu 15-Jun-12 Land Operational 0.11 No recoverable oil was found on site. JIV recommends no further cleanup action required. Closed. Site certification was completed on 10th October 2012. Download Photo Downlaod JIV Report
14-Jun-12 24" Nkpoku - Bomu Pipeline at Ogale 15-Jun-12 Land Operational 0.92 No recoverable oil was found on site.Cleanup of residual impacted area was completed on 5th September 2014. Delays due to protracted Community contracting. Site Certification completed on 27th February 2015. Download Photo Downlaod JIV Report
15-Jun-12 Imo River 1 Well 59T Flowline RoW at Owaza 15-Jun-12 Land Sabotage / Theft 4.3 No recoverable oil was found on site. Initial Cleanup of residual impacted area was completed on 12th September 2012. Remediation was completed on 2nd October 2012. Site Certification was completed on 17th December 2012. Download Photo Downlaod JIV Report
16-Jun-12 Agbada 2 Well 69S Flowline at Umuokwa 17-Jun-12 Land Sabotage / Theft 1.3 Recovery of spilled volume was completed on 17th June 2012. Initial cleanup of residual impacted area was completed on 19th September 2012. Remediation completed on 17th October 2012. Site certification was completed on 23rd November 2012. Download Photo Downlaod JIV Report
18-Jun-12 24" Nkpoku - Bomu Pipeline at Nonwa 20-Jun-12 Land Sabotage / Theft 326.5 Recovery of spilled volume was completed on 22nd June 2012. Initial cleanup of residual impacted area was completed on 31st August 2012. Site Certification completed on 30th April 2013. Download Photo Downlaod JIV Report
19-Jun-12 Ebubu Ejema Well 5/9 Flow Line at Ejama 19-Jun-12 Land Operational 0.001 No recoverable oil was found on site. Spill size was approximately one litre of crude from a disused pipeline. JIV recommends no further cleanup action required. Closed. Site certification completed on 13th November 2012. Download Photo Downlaod JIV Report
21-Jun-12 24" Alakiri - Bonny Pipeline (GPHSL) at Fusokiri / Ilomatoru 24-Jun-12 Swamp Operational 9.5 Recovery of spilled volume was completed on 7th August 2012. Cleanup of residual impacted area was completed on 9th July 2013. Spill was originally reported as a water leak. JIV investigation was delayed due to construction of a cofferdam from 22nd June to 22nd July 2012. JIV commenced on 24th July with a plan to cover approx 1.8km of pipeline. On 2nd August, water was injected into the line under pressure and 4 drilled holes were identified. On 5th August, an Oil leak point was located. JIV was completed on the 7th August 2012. Site Certification was completed on 20th August 2013. Download Photo Downlaod JIV Report
25-Jun-12 24" Nkpoku - Bomu Pipeline at Botem 26-Jun-12 Land Sabotage / Theft 0.64 Recovery of spilled volume was completed on 27th June 2012. Initial clean up of residual impacted area was completed on 23rd July 2012 Site certification completed on 30th June 2013. Download Photo Downlaod JIV Report
25-Jun-12 Imo River 3 Well 5 W/h Location at Igrukwu 26-Jun-12 Land Operational 21.5 Containment in place. Recovery of spilled volume was completed on 26th July 2012. Initial Cleanup of residual impacted area was completed on 15th April 2013. Site Certification was completed on 29th April 2013. Download Photo Downlaod JIV Report
25-Jun-12 24" Bomu - Bonny Pipeline at Bodo West 29-Jun-12 Swamp Sabotage / Theft 1.4 No recoverable oil was found on site. Delay in conclusion of the JIV process was due to community disturbance and Security Issues. Download Photo Downlaod JIV Report
25-Jun-12 28" Nkpoku -Bomu Pipeline at Gio 26-Jun-12 Land Sabotage / Theft 158.2 Recovery was completed on 29th June 2012. Initial cleanup of residual impacted area completed on 22nd April 2013. The spill incident was accompanied by fire which burnt itself out. The JIT discovered two illegally attached lines on the 28” Nkpoku-Bomu pipeline. The area of impact, which extended into a nearby illegal settlement, could not be mapped completely at the first attempt due to security issues. JIV was completed on 12th July 2012. Site certification completed on 30th June 2013. Download Photo Downlaod JIV Report
25-Jun-12 Opukushi Well 24T Flowline ROW 25-Jun-12 Swamp Operational 106.3 Recovery of spilled volume commenced on 24th June 2012 and was completed on 14th July 2012. Initial cleanup of residual impacted area was completed on 14th October 2012. The JIV was conducted in two phases, first to estimate the spill volume on 25th June 2012, and on 30th June 2012, to determine the cause of spill after the spill point was made accessible. Site certification completed on 21st November 2012. Download Photo Downlaod JIV Report
27-Jun-12 24" Alakiri - Bonny Trunkline at Kalaibiama 18-Aug-12 Swamp Sabotage / Theft 24.3 Recovery of spilled volume was completed on 20th August 2012. Initial Cleanup of residual impacted area was completed on 14th November 2012. Remediation was completed on 17th November 2012. Delay in JIV due to construction of a Cofferdam to access the spill point. Overall schedule considers impact of the rainy season. Site certification completed on 17th December 2012. Download Photo Downlaod JIV Report
29-Jun-12 4" Obele - Ibaa Pipeline at Ibaa. 02-July-12 Land Sabotage / Theft 6.1 Containment in place. No recoverable oil was found on site. Site certification was completed on 23rd November 2012. Download Photo Downlaod JIV Report
30-Jun-12 Awoba Well 8T at Awoba 10-Aug-12 Swamp YTD NA No recoverable oil was found on site. An initial attempt was made to carry out a JIV on 26th July 2012, but without success, due to constraints resulting from a cluster of pipelines at a river crossing. Another JIV on 10th August 2012 recommended further investigation in order to determine whether a spill occurred and if so, establish the cause. Download Photo Downlaod JIV Report