June 2011PDF
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
8-Jun-11 Obigbo Well 28 Flowline at Obigbo 10-Jun-11 Land Sabotage / Theft 5.2 Recovery of spilled volume completed on 14th June 2011. Cleanup of residual impacted area completed on 27th June 2011. Post Cleanup Inspection completed on 13th July 2011. PDF PDF
8-Jun-11 12" Imo River 1 Ogale Pipeline at Owaza 9-Jun-11 Land Sabotage / Theft 4.5 Recovery of spilled volume completed on 9th June 2011. Cleanup of residual impacted area completed on 13th July 2011. Post Cleanup Inspection completed on 19th July 2011. PDF PDF
9-Jun-11 10" Ekulama 2 Pipeline at Ekulama 13-Jun-11 Swamp / Water Operational 15 No recoverable oil was found on site due to tidal overflow. Cleanup of residual impacted area commenced on 15th September 2011 and was completed on 29th October 2011. Overall schedule considers community contracting, the onset of the rainy season and difficulty of work terrain. Post cleanup inspection completed on 4th November 2011. PDF PDF
9-Jun-11 6" Imo River Well 59 Flowline at Well Head 15-Jun-11 Land Sabotage / Theft 9.2 RRecovery of spilled volume completed on 15th June 2011. Cleanup of residual impacted area completed on 13th October 2011. Post Cleanup Inspection completed on 21st February 2012. PDF PDF
9-Jun-11 24" Bomu-Bonny Pipeline at & Bodo / Mogho 10-Jun-11 Land Sabotage / Theft 15 Recovery of spilled volume completed on 10th June 2011. Cleanup of residual impacted area completed on 26th June 2011. Spill was accompanied by fire. Cleanup of residual impacted area and remediation was delayed due to a mix up in the location of the incident site (Moghoo versus Bodo). Site Certifcation was completed on 30th September 2014. PDF PDF
9-Jun-11 24" Nkpoku - Bomu Pipeline at Bera 13-Jun-11 Land Sabotage / Theft 31 Recovery of spilled volume completed on 13th June 2011. Cleanup of residual impacted area completed on 26th June 2011. Spill was accompanied by fire. Post Cleanup Inspection completed on 29th September 2011. PDF PDF
9-Jun-11 28" Bomu-Bonny Pipeline at Bodo / Mogho 11-Jun-11 Land Sabotage / Theft 16 Recovery of spilled volume completed on 11th June 2011. Cleanup of residual impacted area completed on 26th June 2011. Spill was accompanied by fire. Cleanup of residual impacted area and remediation was delayed due to a mix up in the location of the incident site (Moghoo versus Bodo). Site Certifcation was completed on 30th September 2014. PDF PDF
9-Jun-11 28" Bomu-Bonny Pipeline at Mogho 11-Jun-11 Land Sabotage / Theft 2 No recoverable oil was found on site. Cleanup of residual impacted area completed on 13th July 2011. Spill was accompanied by fire. Post Cleanup Inspection completed on 14th July 2011. PDF PDF
10-Jun-11 24" Nkpoku - Bomu Pipeline at Biara 12-Jun-11 Land Sabotage / Theft 195 Recovery of spilled volume completed on 12th June 2011. Cleanup of residual impacted area completed on 26th June 2011. Spill was accompanied by fire. Post Cleanup Inspection completed on 28th July 2011 PDF PDF
14-Jun-11 12" Imo River 1 Pipeline at Owaza 15-Jun-11 Land Sabotage / Theft 6 Recovery of spilled volume completed on 16th June 2011.Cleanup of residual impacted area completed on 13th July 2011. Post Cleanup Inspection completed on 19th July 2011. PDF PDF
14-Jun-11 Olomoro compressor station saver pit 16-Jun-11 Land Operational 7.1 Containment in place, recovery stalled by community issues. Cleanup of impacted areas stalled by lingering intra-community conflicts while engagement continues for access to spill site. However, following a recurrence of the Olomoro compressor station saver pit overflow, this incident now closed. Progress to be monitored via new entry (see incident of 7th November 2011). PDF PDF
14-Jun-11 Ughelli West Well 2L 3'' Flowline 17-Jun-11 Land Operational 19.5 Recovery of spilled volume completed on 17th June 2011. Initial cleanup of residual impacted area completed on 11th May 2012. The initially nominated community contractor rejected the offer to execute cleanup works. Following engagement with the community, a new nomination was received on 17th August 2011. However, the replacement contractor also rejected the offer to execute the cleanup works. Post Cleanup Inspection completed on 14th May 2012 PDF PDF
14-Jun-11 24" Nkpoku - Bomu Pipeline at Akpajo 16-Jun-11 Land Operational 862.6 Recovery of spilled volume commenced on 17th June 2011 and completed on 22nd August 2011. Cleanup of residual impacted area commenced on 13th September 2011 and was completed on 24th October 2011. JIV started on 16th and was completed on 17th June 2011. Post cleanup inspection completed on 26th October 2011. PDF PDF
14-Jun-11 Imo River Well 56 L Flowline at Isietitioha 17-Jun-11 Land Sabotage / Theft 1 No recoverable oil was found on site. Cleanup of residual impacted area completed on 30th July 2011. Spill was accompanied by fire. Post cleanup inspection completed on 22nd September 2011. PDF PDF
14-Jun-11 Imo River Well 55 S Flowline at Igiriukwu 17-Jun-11 Land Sabotage / Theft 3 Recovery of spilled volume completed on 17th June 2011. Cleanup of residual impacted area completed on 30th July 2011. Site re-impacted prior to Post Cleanup Inspection as a result of the Imo River 3 Well 55S ROW spill incident at Imo River of 13th February 2012. This incident is now closed. Clean up of re-impacted area will be tracked as a new incident reported on 13th February 2012. PDF PDF
14-Jun-11 14" Okordia-Rumuekpe Pipeline and Akalamini Riser at Akalamini 19-Jun-11 Land Sabotage / Theft 4.68 Recovery of spilled volume and clean up of residual impacted area completed on 22nd June 2011. Post cleanup inspection completed on 24th August 2011 PDF PDF
16-Jun-11 12" Imo River 2 Pipeline at Owaza 16-Jun-11 Land Sabotage / Theft 138.5 Recovery of spilled volume commenced on 16th June 2011. Clean up of residual impacted area completed on 22nd July 2011. Spill was at a point 60 metres from the pipeline, linked by an illegally attached bunkering hose. Post cleanup inspection completed on 29th November 2011. Protracted delay due to site flooding during the rainy season as well as security issues which were only resolved in November 2011. PDF PDF
16-Jun-11 12" Imo River 2 Manifold at Odagwa 17-Jun-11 Land Sabotage / Theft 164.2 Recovery of spilled volume commenced on 17th June 2011 and was completed on 28th June 2011. Cleanup of residual impacted area completed on 20th August 2011. Post cleanup inspection initially planned for completion in January 2012. Protracted delay due to site flooding during the rainy season as well as security issues which were only resolved in November 2011. Schedule revised due to Nigerian labour strike action in January 2012. Post cleanup inspection completed on 31st January 2012. PDF PDF
18-Jun-11 36" Rumuekpe-Nkpoku Pipeline at Aluu 19-Jun-11 Land Sabotage / Theft 7 Recovery of spilled volume completed on 20th June 2011.Clean up of residual impacted area completed on 22nd July 2011. Post Cleanup inspection completed on 24th August 2011. PDF PDF
18-Jun-11 Agbada 2 Flowstation Well 2T ROW 20-Jun-11 Land Operational 2 No recoverable oil was found on site. Cleanup of residual impacted area completed on 12th September 2011 Post Cleanup inspection completed on 25th October 2011. PDF PDF
20-Jun-11 Cawthorne Channel 2 Well 45T Flowline at Cawthorne Channel 23-Jun-11 Swamp Operational 4 Recovery of spilled volume completed on 25th June 2011. Cleanup of residual impacted area commenced on 21st September 2011 and was completed on 28th September 2011. Post Cleanup Inspection completed on 6th October 2011. PDF PDF
25-Jun-11 18” Assa–Rumuekpe Trunkline at Awara 27-Jun-11 Land Sabotage / Theft 0.72 No recoverable oil was found on site. Post Cleanup inspection completed on 28th July 2011. PDF PDF
26-Jun-11 8" Isimiri Pipeline at Umuaghala 28-Jun-11 Land Sabotage / Theft 303.5 Recovery of spilled volume commenced on 28th June 2011 and was completed on 22nd August 2011. Cleanup of residual impacted area commenced on 24th October 2011 and was completed on 31st December 2011. Cleanup of residual impacted area was executed in combination with an earlier spill that was reported on 7th April 2011, as the impact areas overlap. Delay due to site flooding as a result of heavy rains. Post Cleanup inspection completed on 26th January 2012. PDF PDF
26-Jun-11 Cawthorne Channel 2 Well 32S Flowline at Cawthorne Channel 29-Jun-11 Swamp Sabotage / Theft 3 No recoverable oil was found on site. Cleanup of residual impacted area completed on 3rd September 2011. Post Cleanup inspection completed on 6th October 2011. PDF PDF
26-Jun-11 Obigbo Well 20T Flowline at Umuebule 28-Jun-11 Land Operational 1.3 Recovery of spilled volume completed on 28th June 2011. Cleanup of residual impacted area completed on 21st July 2011 Post Cleanup inspection completed on 30th September 2011. PDF PDF
27-Jun-11 12" Imo River Pipeline at Uzuaku 29-Jun-11 Land Sabotage / Theft 724.6 Recovery of spilled volume commenced on 28th June 2011 and was completed on 23rd September 2011. Cleanup of residual impacted area completed on 12th October 2011. Delay in the cleanup of residual impacted areas was due to site flooding as a result of heavy rains. Post Cleanup Inspection completed on 29th November 2011. Initial volume of spill estimated during JIV of 29th June 2011 was 40.6 bbls. However, 507 bbls of oil was subsequently recovered, resulting in a restated volume of 724.6 bbls. Restated volume has been communicated to the Regulators as per statutory requirement. PDF PDF
28-Jun-11 Imo River Well 28L Flowline at Umuedeokware. 1-Jul-11 Land Sabotage / Theft 1.05 No recoverable oil was found on site. Cleanup of residual impacted area commenced on 26th October 2011 and was completed on 31st October 2011. Delay in cleanup was due to site flooding as a result of heavy rains. Post Cleanup Inspection completed on 29th November 2011. PDF PDF
30-Jun-11 Nun River Well 15 Flowline at Nun River 11-Jul-11 Swamp / Land Sabotage / Theft 2.95 No recoverable oil was found on site. Cleanup of residual impacted area completed on 6th September 2011 Post Cleanup Inspection completed on 23rd November 2011. PDF PDF