January 2011
Date Reported Incident Site JIV Date Terrain Cause Est. Spill Volume (bbl) Clean-up Status Comments Photo JIV Report *
7-Jan-11 Belema well 3 at Belema 9-Jan-11 Swamp / Water Sabotage / Theft 69 Clean up of residual impacted areas completed on 28th January 2011. Well was secured on 9th January 2011. No recoverable oil found on site, free phase oil was consumed by fire. Post Cleanup Inspection was carried out on 20th April 2011. PDF PDF
7-Jan-11 10'' Kokori Pipeline at Idjerhe 11-Jan-11 Land Sabotage / Theft 3.5 Cleanup completed on 8th February 2011 No recoverable oil was found on site. JIV took two days, concluded on 12th January 2011. Post Cleanup Inspection was carried out on 10th February 2011. PDF PDF
9-Jan-11 Ubie Well 9S Flowline at Ubie 11-Jan-11 Land Sabotage / Theft 399 Recovery of spilled volume completed on 29th January 2011. Cleanup completed on 19th February 2011. Initial volume of spill estimated during JIV of 11Jan2011 was 23.1 bbls. However, 279 bbls of oil was subsequently recovered from a pit and under vegetation near the spill point, resulting in a restated volume of 399 bbls. Restated volume has been communicated to the Regulators as per statutory requirement. Post Cleanup Inspection was carried out on 21st March 2011 PDF PDF
13-Jan-11 28" Trans Niger Pipeline at Bodo Creek 15-Jan-11 Swamp Sabotage / Theft 233 Recovery of spilled volume completed on 25th Jan 2011. The recovered volume included oil from non-SPDC sources in the same locality. Additional recovered volume has been communicated to the Regulators. Initial volume of spill estimated during the JIV of 15th Jan 2011 was 129 bbls. However, 156 bbls of oil was subsequently recovered, resulting in a restated volume of 233 bbls. The site is continually being impacted by crude oil bunkering and illegal refinery activities. Discussions with the authorities continue to bring about a permanent solution leading to long term cleanup and remediation. Despite the occurrence of frequent re-impacting from other sources, SPDC commenced pre-cleanup assessment of the area on 19th April and this was completed on 28th May 2011. Cleanup of the entire impacted area as assessed was initiated on 20th December 2011, starting at the Gio end, which has the least potential for re-impact. Work will then proceed downstream for full coverage and minimum risk of re-impacting. PDF PDF
13-Jan-11 12'' Benisede - Isampou Pipeline at Ekeremor 19-Jan-11 Swamp Sabotage / Theft 178.2 Recovery of spilled volume was scheduled for completion in January 2011, but suspended on 21st January 2011 due to community disturbance. Community issue now resolved. Cleanup of residual impacted areas re-commenced on 26th March 2011 and was completed on 23rd April 2011. Following the JIV of 19th January 2011, a second leak point was confirmed on the same 12" Benisede - Isampou pipeline, about 2km East of the first point. A second JIV was carried out on 9th February 2011. Post Cleanup Inspection was completed on 4th May 2011. PDF PDF
15-Jan-11 Agbada Well 58L Wellhead at Agbada 18-Jan-11 Land Operational 1 Recovery of spilled volume completed on 21st January 2011. Clean up of residual impacted areas completed on 1st February 2011. Post cleanup inspection completed on 16th February 2011. PDF PDF
15-Jan-11 Nun River Well 15 Flowline at Nun Rive 18-Jan-11 Swamp/Land Sabotage / Theft 8.6 Recovery of spilled volume which was suspended on 20th January 2011, recommenced on 5th February 2011 and completed on 9th February 2011. Cleanup completed on 24th February 2011. Post Cleanup Inspection was carried out on 6th May 2011. PDF PDF
15-Jan-11 Otamiri Well 7L Flowline at Umuechem 18-Jan-11 Land Operational 1 No recoverable oil was found on site. Spilled oil absorbed into the soil. Cleanup completed on 10th February 2011 Cleanup of residual impacted areas was initially disrupted by community on 2nd February 2011. Post Cleanup Inspection was carried out on 23rd February 2011. PDF PDF
17-Jan-11 Bonny Flow Station at Oloma 18-Jan-11 Water Operational 3 No recoverable oil was found on site. Spill impact observed as dispersing sheen and stains within bund wall. Cleanup completed on 16th February 2011. Post Cleanup Inspection initially planned for April 2011, but delayed due to movement restrictions associated with the April 2011 general elections. Post Cleanup Inspection completed on 19th May 2011. PDF PDF
21-Jan-11 28" Trans Niger Pipeline at Bodo 26-Jan-11 Swamp / Water Sabotage / Theft 118.4 Recovery of spilled volume completed on 1st February 2011. Site is continually being impacted by crude oil bunkering and illegal refinery activities. Discussions are on-going with the authorities to try to bring about a permanent solution leading to long term cleanup and remediation. Despite the occurrence of frequent re-impacting from other sources, SPDC commenced pre-cleanup assessment of the area on 19th April and this was completed on 28th May 2011. Cleanup of the entire impacted area as assessed has been initiated on 20th December 2011. Work has started first at the Gio end of the assessed area, which has the least potential for re-impact and will shortly cover other areas too. Work will proceed to further downstream areas for full coverage and minimum risk of re-impacting. PDF PDF
22-Jan-11 Cawthorne Channel Well 21L Flowline 24-Jan-11 Swamp Sabotage / Theft 2 Recovery of spilled volume completed 24th January 2011. Cleanup of residual impacted area completed on 11th February 2011. Post Cleanup Inspection was carried out on 20th April 2011. PDF PDF
28-Jan-11 Egwa 1 Well 26 at Okpogbene 1-Feb-11 Swamp Sabotage / Theft 2.9 No recoverable oil was found on site. Spill impact observed as stains on vegetation by the river bank. Cleanup of residual impacted areas completed on 19th March 2011. Incident site corrected to read Egwa 1 Well 26 at Okpogbene and not Egwa 1 Well 27 at Okpogbene, as erroneously captured in JIV report and photo captions. Post Cleanup Inspection was carried out on 7th April 2011. PDF PDF
28-Jan-11 24" Nembe Creek Trunkline (old NCTL) Pipeline at Tora-Twenikiri 4-Feb-11 Swamp Sabotage / Theft 1.08 No recoverable oil was found on site. Spill impact observed as sheen and stains on vegetation/soil. Cleanup completed on 17th February 2011 Post Cleanup Inspection earlier planned for April 2011 will now hold in May 2011 due to movement restrictions associated with the April 2011 general elections. Post Cleanup Inspection completed on 26th May 2011. PDF PDF