April 2017
Date Reported Incident Site JIV Date Terrain Cause Estimated Spill Volume (bbl) Clean-up Status Comments Photo JIV Report
02.04.2017 Bonny Oil & Gas Terminal Emulsion Tank (T1201B) at Bonny 07.04.2017 Land Operational 42 Spill was contained on 01 Apr 2017, recovery completed on 28 Apr 2017, assessment planned for June 2017 - Download Download
03.04.2017 20" Otumara - Escravos Pipeline at Ugboegungun 09.04.2017 Swamp Sabotage 11 Recovery completed on 12 Apr 2017, assessment completed on 04 May 2017, clean-up and remediation planned for January 2018 - Download Download
05.04.2017 4'' Otumara Well 9T Flowline at Ugboegungun 09.04.2017 Swamp Sabotage 0.1 Spill was contained on 06 Apr 2017, no recoverable oil found, assessment completed on 04 May 2017, clean-up and remediation planned for January 2018 - Download Download
06.04.2017 12'' Imo River 2 - Ogale Pipeline at Owaza 08.04.2017 Land Sabotage 2 No recoverable oil found, assessment completed on 27 Apr 2017, clean-up and remediation planned for January 2018 - Download Download
15.04.2017 Afam Well27T & 25T Flowline at Ayama 20.04.2017 Land Sabotage 6 No recoverable oil found, assessment planned for May 2017 - Download Download
15.04.2017 Imo River Well 25S Flowline at Umuedeokwara 19.04.2017 Land Sabotage 2 No recoverable oil found, assessment planned for June 2017 - Download Download
23.04.2017 Benisede Well16T Wellhead at Ojobo 04.05.2017 Swamp Sabotage 0.6 No recoverable oil found, assessment planned for June 2017 - Download Download
26.04.2017 4" Otumara Well 29L/S Flowlines at Ugboegungun 22.04.2017 Swamp Sabotage 0.1 Spill was contained on 22 Apr 2017, no recoverable oil found, assessment planned for July 2017 - Download Download